In brief
In team leasing you own the result: the IT company's team works to your priorities, and the company answers for the people's skills, team continuity and the diligence of their work. In project outsourcing responsibility for the result moves to the IT company: it commits to delivering a defined outcome by a date, and you answer for decisions, access to knowledge and acceptance. The difference is not the people. It is who carries the risk when the outcome does not materialize.
Two models, two kinds of obligation
Team leasing is a model in which the IT company's engineers work inside your delivery process: in your backlog, at your meetings, to the priorities set by your product owner. You pay for the team's time. The IT company commits that the people have the skills described in the role profiles, that they work diligently, and that when someone leaves, a successor arrives with a knowledge handover.
Project outsourcing is a model in which the IT company takes on the outcome: a working integration, a tested release, migrated data. It picks the team, plans the work and directs it. You pay for the scope or per milestone, and what gets assessed is not hours but whether the outcome meets the acceptance criteria.
Polish law reflects this difference in contract types. A contract for a specific work (Article 627 of the Polish Civil Code) obliges the contractor to produce a defined piece of work, meaning a result. A contract for services (Article 750 of the Civil Code refers to the provisions on mandate) obliges the contractor to act with due diligence. IT contracts are usually mixed, but their core tends to resemble one of these two types, and that core decides what you can claim when something goes wrong.
A general comparison of three engagement models (an engineer, a team, a project) is in the article Engineer, team or project. Here we look only at responsibility.
Who answers for what: a table
| Matter | Team leasing | Project outsourcing |
|---|---|---|
| Priorities and scope | you | set in the contract, changes go through change control |
| Day-to-day direction | your lead or product owner | the IT company's project manager |
| Architecture and technical decisions | your team, engineers advise | the IT company, within your requirements |
| Code quality | a shared standard that you set | the IT company, measured by acceptance criteria |
| Deadline | you plan, the IT company answers for people's availability | the IT company, with a schedule in the contract |
| Defects after go-live | the team fixes them in later sprints, at your cost | the IT company's warranty |
| Team composition and replacements | the IT company | the IT company |
| Code ownership | assigned to you in the contract | assigned to you on acceptance |
The most important row is “defects after go-live”. In team leasing a bug fix is more hours of team time. In a project it is the IT company's warranty obligation, because the outcome did not meet the contract.
Where the models get confused
Most disputes come from a contract that mixes both models without saying so. Typical situations:
- A team billed for time, but with a “deadline guarantee”. The IT company does not direct the work, so it cannot answer for a deadline it does not plan. Such a clause usually ends in an argument about who changed the priorities.
- A fixed-scope project in which the client reassigns tasks every day. If you direct the work yourself, the IT company stops being responsible for the result, because it no longer decides it. Changes should go through change control with a price.
- No product owner on either side. In team leasing the client must have one. Without one the team works on whatever someone happened to raise. How to split Scrum roles with an external team is covered in the article Scrum Master and Product Owner in a team with an external vendor.
A good rule: responsibility for the result goes together with the right to decide. Whoever sets the scope and the order answers for the outcome.
How to write responsibility into the contract
Whatever the model, the contract should spell out a few things:
- The subject of the obligation. The time of a team with a defined composition, or an outcome with a description and acceptance criteria. How to write such criteria is covered in the article Acceptance in an IT project.
- Who directs the work. The named role on your side and on the IT company's side, with the scope of their decisions.
- Team continuity. The time to a successor, the overlap period and who pays for the knowledge handover.
- Changes. In a project: a change procedure with pricing and schedule impact. In team leasing: how people are added and removed.
- Defects and warranty. In a project: the warranty period, response times, defect classes. In team leasing: what happens when a person's skills do not match the role profile.
- Rights to code and documentation. An assignment of economic copyright with the fields of exploitation and the moment the rights pass.
- Exit. Handover of code, documentation and knowledge at the end, described in the article IT vendor exit plan.
In the financial sector DORA adds another layer. Article 28(1) of the regulation says that a financial entity remains fully responsible for compliance even when it uses ICT third-party service providers. Project outsourcing therefore does not move regulatory responsibility to the IT company. It moves only the contractual responsibility for the outcome.
When to choose which model
Choose team leasing when: you have your own delivery process and a person who sets priorities every day; the work is ongoing with no clear end; requirements change every sprint; knowledge of the system should stay in your organization. An example is the team of testers and automation engineers for a software vendor, which works to the client's release cadence.
Choose project outsourcing when: you can describe the outcome and how to verify it; you do not have people to direct the work; you need a predictable price; the work has a clear end, such as a data migration, a performance test before a peak or an integration of two systems.
When you do not know which model fits, start with a short analysis phase at a fixed price. Its output, a description of scope and risks, will show whether the rest of the work can be ordered as a project. How to match the billing model to that decision is covered in the article Time and materials or fixed price. The capabilities we work with in both models are in the section What we do.
Questions and answers
Is team leasing the same as staff augmentation?
Not always. Staff augmentation usually means individual people plugged into the client's team, with no responsibility on the IT company's side beyond filling the role. In team leasing the IT company answers for the team as a whole: its composition, replacements, ways of working and often a lead who is your point of contact. In both cases you own the result, because you direct the work.
Who pays for bug fixes in team leasing?
Usually you, because a fix is more time of a team you direct. The IT company answers for diligence, so you can raise grossly poor work or a lack of the skills in the role profile, for example by asking for a different person. If you want the contractor to answer for defects, you need an obligation to deliver a result, meaning a project with a warranty.
Can I influence how the work is done in project outsourcing?
You can set non-functional requirements, coding standards, tools and a review cadence, ideally in the contract. You should not, however, assign tasks to the IT company's people day to day. If you do, you take over direction of the work, and then it becomes hard to hold the contractor responsible for the deadline and the result.
Which model is cheaper?
The hourly rate in team leasing is often lower, because the IT company does not price in the risk of the result. In a project you pay for that risk in the price, but you do not pay for defects and delays on the contractor's side. The cost therefore depends on who is better at controlling the risk. A reference point for rates is our rate report.