The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Knowledge of the system left with the contractor, the documentation is incomplete, and the system must keep evolving as regulations change.
- Approach
- We provide a team that takes over maintenance: reverse engineering of key modules, reconstructing the documentation, characterization tests, and a gradual takeover of tickets.
- Goal
- Time from reporting a need to a specialist starting: ≤ 5 business days; Time for a new hire to work independently: ≤ 4 weeks.
Client context
Public bodies run IT projects under public procurement rules, with formal acceptance of stages and digital accessibility obligations. Systems must run for years and be maintainable by successive contractors. The client is a central government unit that maintains a line-of-business system whose original contractor has ended the cooperation.
Challenge
Knowledge of the system left with the contractor, the documentation is incomplete, and the system must keep evolving as regulations change.
Requirements and constraints
- The Polish Public Procurement Law affects how work is settled (often a fixed price for a defined scope), the requirements for copyright and handover of source code, and formal acceptance of stages. The schedule must account for the contracting authority's acceptance procedures. (source)
- The National Interoperability Framework (KRI) sets minimum requirements for the IT systems of public bodies: interoperability, security, accessibility, and internal audit. The project must leave behind documentation that lets the contracting authority pass an inspection. (source)
- GDPR, i.e. Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, processing agreements, and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation the client's team can take over.
Approach and architecture
We assemble the team for the client's system, not from whoever happens to be available: a first proposal of candidates within 24 hours, interviews with the client, and a start within 5 business days. Every specialist has a mentor on our side, and the account manager reviews work quality, rotation risks, and competence needs with the client's lead every month. If someone leaves, the search for a replacement starts immediately, with an overlap period for knowledge transfer.
We provide a team that takes over maintenance: reverse engineering of key modules, reconstructing the documentation, characterization tests, and a gradual takeover of tickets. All the knowledge goes into the contracting authority's repository.
Key elements of the solution:
- Reverse engineering and module documentation
- Characterization tests before changes
- A staged takeover of tickets
- The contracting authority's knowledge repository
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| B2B.NET account manager | 1 | single point of contact, escalations, selecting further team members |
| Delivery manager | 1 | team continuity, delivery quality, monthly reviews with the client |
| Backend developer (Java/Kotlin) | 3 | domain services, API, unit tests |
| Test analyst (ISTQB) | 2 | designing and executing test cases, reporting defects |
| Database administrator | 1 | tuning, backups, schema migrations |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Role profiles and selection criteria | 1–5 | role descriptions, technical criteria |
| 2. Selection and interviews | 6–10 | shortlist, client decisions |
| 3. Onboarding and first tasks | 11–18 | access, mentoring, 30-day plan |
| 4. Working in the client's rhythm | 19–47 | monthly reviews, reports |
| 5. Annual review and try-and-hire option | 48–52 | assessment, hiring decisions |
Technology stack
Matched to the system's stack: Java, Oracle, an application server, Jira.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Undocumented behavior of the legacy system | characterization tests (golden master) before a change, old versus new result comparisons |
| Knowledge held in the heads of individuals | pair programming, documentation in the repository, a backup plan for key roles |
| Specialist turnover | mentoring, an overlap period on change, a replacement within 5 business days |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Time from reporting a need to a specialist starting | ≤ 5 business days | request register |
| Time for a new hire to work independently | ≤ 4 weeks | team lead assessment |
| Critical defects found after go-live | 0 critical defects in the first 30 days | production incident log |
Lessons learned and good practices
Characterization tests are the only safe way to change a system that has no documentation. A knowledge repository on the contracting authority's side protects it from the next contractor departure. Selecting people for a specific system shortens onboarding more than any documentation.
Why B2B.net
B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audits are an everyday matter: in banks, insurers, and critical infrastructure. We are an accredited exam center, so a test methodology is not a declaration for us but a working standard. We deliver a first proposal of specialists within 24 hours, and a team can start within 5 business days.
Acceptance criteria
Each phase ends with formal acceptance against criteria agreed at the start. In this engagement, acceptance covers: role descriptions, technical criteria; shortlist, client decisions; access, mentoring, 30-day plan; monthly reviews, reports; assessment, hiring decisions. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.
Next step
Let's talk about your project. Within 24 hours we will get back to you with a quote or a proposal of engineers; a team can start within 5 business days. Contact: office@b2bnetwork.pl.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.