Maintenance team for a public administration line-of-business system

Project write-up

The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.

In brief

Problem
Knowledge of the system left with the contractor, the documentation is incomplete, and the system must keep evolving as regulations change.
Approach
We provide a team that takes over maintenance: reverse engineering of key modules, reconstructing the documentation, characterization tests, and a gradual takeover of tickets.
Goal
Time from reporting a need to a specialist starting: ≤ 5 business days; Time for a new hire to work independently: ≤ 4 weeks.

Client context

Public bodies run IT projects under public procurement rules, with formal acceptance of stages and digital accessibility obligations. Systems must run for years and be maintainable by successive contractors. The client is a central government unit that maintains a line-of-business system whose original contractor has ended the cooperation.

Challenge

Knowledge of the system left with the contractor, the documentation is incomplete, and the system must keep evolving as regulations change.

Requirements and constraints

  • The Polish Public Procurement Law affects how work is settled (often a fixed price for a defined scope), the requirements for copyright and handover of source code, and formal acceptance of stages. The schedule must account for the contracting authority's acceptance procedures. (source)
  • The National Interoperability Framework (KRI) sets minimum requirements for the IT systems of public bodies: interoperability, security, accessibility, and internal audit. The project must leave behind documentation that lets the contracting authority pass an inspection. (source)
  • GDPR, i.e. Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, processing agreements, and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
  • Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation the client's team can take over.

Approach and architecture

We assemble the team for the client's system, not from whoever happens to be available: a first proposal of candidates within 24 hours, interviews with the client, and a start within 5 business days. Every specialist has a mentor on our side, and the account manager reviews work quality, rotation risks, and competence needs with the client's lead every month. If someone leaves, the search for a replacement starts immediately, with an overlap period for knowledge transfer.

We provide a team that takes over maintenance: reverse engineering of key modules, reconstructing the documentation, characterization tests, and a gradual takeover of tickets. All the knowledge goes into the contracting authority's repository.

Key elements of the solution:

  • Reverse engineering and module documentation
  • Characterization tests before changes
  • A staged takeover of tickets
  • The contracting authority's knowledge repository

Team and roles

RoleCountResponsibility
B2B.NET account manager1single point of contact, escalations, selecting further team members
Delivery manager1team continuity, delivery quality, monthly reviews with the client
Backend developer (Java/Kotlin)3domain services, API, unit tests
Test analyst (ISTQB)2designing and executing test cases, reporting defects
Database administrator1tuning, backups, schema migrations
Product owner and domain experts (client side)as neededpriorities, business decisions, acceptance

Phased schedule

PhaseWeeksDeliverable
1. Role profiles and selection criteria1–5role descriptions, technical criteria
2. Selection and interviews6–10shortlist, client decisions
3. Onboarding and first tasks11–18access, mentoring, 30-day plan
4. Working in the client's rhythm19–47monthly reviews, reports
5. Annual review and try-and-hire option48–52assessment, hiring decisions

Technology stack

Matched to the system's stack: Java, Oracle, an application server, Jira.

Risks and how we mitigate them

RiskHow we mitigate it
Undocumented behavior of the legacy systemcharacterization tests (golden master) before a change, old versus new result comparisons
Knowledge held in the heads of individualspair programming, documentation in the repository, a backup plan for key roles
Specialist turnovermentoring, an overlap period on change, a replacement within 5 business days

Measurable goals and KPIs

The values below are targets that we set with the client after a baseline measurement in the first phase.

KPITargetHow it is measured
Time from reporting a need to a specialist starting≤ 5 business daysrequest register
Time for a new hire to work independently≤ 4 weeksteam lead assessment
Critical defects found after go-live0 critical defects in the first 30 daysproduction incident log

Lessons learned and good practices

Characterization tests are the only safe way to change a system that has no documentation. A knowledge repository on the contracting authority's side protects it from the next contractor departure. Selecting people for a specific system shortens onboarding more than any documentation.

Why B2B.net

B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audits are an everyday matter: in banks, insurers, and critical infrastructure. We are an accredited exam center, so a test methodology is not a declaration for us but a working standard. We deliver a first proposal of specialists within 24 hours, and a team can start within 5 business days.

Acceptance criteria

Each phase ends with formal acceptance against criteria agreed at the start. In this engagement, acceptance covers: role descriptions, technical criteria; shortlist, client decisions; access, mentoring, 30-day plan; monthly reviews, reports; assessment, hiring decisions. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.

Next step

Let's talk about your project. Within 24 hours we will get back to you with a quote or a proposal of engineers; a team can start within 5 business days. Contact: office@b2bnetwork.pl.

What would this look like for you?

Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.