Skip to content
All projects

KRI audit and implementation of information security management in a local government unit

Project write-up

The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.

In brief

Problem
Security documentation is out of date, backups are not tested, and an inspection pointed to gaps in access rights management.
Approach
A compliance audit against the National Interoperability Framework (KRI) and a risk analysis, updated policies, an access rights review, a backup restore test, and employee training.
Goal
Compliance gaps closed: 100% of critical gaps before the regulatory deadline; Successful backup restore tests: 100% of quarterly tests.

Client context

Public administration is digitizing services for citizens and businesses, and the requirements for interoperability, accessibility, and security are written into law here, not just into good practice. The client is a county office with several subordinate units, a small IT department, and an obligation to conduct an annual information security audit.

Challenge

Security documentation is out of date, backups are not tested, and an inspection pointed to gaps in access rights management.

Requirements and constraints

  • The National Interoperability Framework (KRI) sets minimum requirements for the IT systems of public bodies: interoperability, security, accessibility, and internal audit. The project must leave behind documentation that lets the contracting authority pass an inspection. (source)
  • The Polish National Cybersecurity System Act (KSC) defines the obligations of operators of essential services, including incident handling, cooperation with CSIRTs, and security audits every two years. The project must provide for an incident reporting procedure and audit trails. (source)
  • GDPR, i.e. Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, processing agreements, and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
  • ISO/IEC 27001:2022 requires a documented information security management system: risk analysis, a statement of applicability, access control, and supplier management. Every element of the project must be traceable to a control in Annex A. (source)
  • Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation the client's team can take over.

Approach and architecture

We run the compliance program like a product project: requirements mapped to controls, controls to evidence, evidence to systems. Wherever possible, we replace manual spreadsheets with automated reports (access reviews, asset inventory, patch status), and we rehearse incident scenarios with management, because the regulations require its real involvement.

A compliance audit against the KRI and a risk analysis, updated policies, an access rights review, a backup restore test, and employee training. A compliance calendar lets the unit maintain the system on its own.

Key elements of the solution:

  • KRI audit and risk analysis
  • Updated policies and procedures
  • Access rights review and backup restore test
  • Training and a compliance calendar

Team and roles

RoleCountResponsibility
Compliance specialist1requirements map, documentation, compliance evidence
Security architect1threat model, security requirements, design reviews
IT support engineer1tickets, workstations, accounts, hardware
Product owner and domain experts (client side)as neededpriorities, business decisions, acceptance

Phased schedule

PhaseWeeksDeliverable
1. Gap analysis and risk assessment1–4gap report, risk register
2. Framework and documentation design5–8policies, procedures, registers
3. Implementation of technical controls9–15controls, evidence automation
4. Exercises and tests16–18incident exercises, resilience tests
5. Internal audit and maintenance plan19–20audit report, compliance calendar

Technology stack

Microsoft 365, Active Directory, a backup solution, documentation templates.

Risks and how we mitigate them

RiskHow we mitigate it
Knowledge held in the heads of individualspair programming, documentation in the repository, a backup plan for key roles
Diverging stakeholder expectationsstakeholder map, a shared definition of success, a monthly steering committee
Unknown systems and accounts (shadow IT)an inventory from tools and interviews, an asset register, centralized identity management

Measurable goals and KPIs

The values below are targets that we set with the client after a baseline measurement in the first phase.

KPITargetHow it is measured
Compliance gaps closed100% of critical gaps before the regulatory deadlinecompliance backlog
Successful backup restore tests100% of quarterly testsrestore protocols
Accounts with multi-factor authentication100% of accountsidentity console

Lessons learned and good practices

A compliance calendar turns a one-off audit into an ongoing process. A backup restore test is the most important and most often skipped control. Management involvement has to be scheduled in the calendar, not left to chance.

Why B2B.net

We combine two models: we provide individual specialists and entire teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA, and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.

Acceptance criteria

Each phase ends with formal acceptance against criteria agreed at the start. In this engagement, acceptance covers: gap report, risk register; policies, procedures, registers; controls, evidence automation; incident exercises, resilience tests; audit report, compliance calendar. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.

Next step

If you recognize these problems in your organization, let's start with a short diagnosis: one workshop with your team and written recommendations. Write to us at office@b2bnetwork.pl.

What would this look like for you?

Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.

Let's talk

B2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.

More projects: Public sector