Skip to content

Building a QA team from scratch: roles, hiring order and first processes

B2Bnetwork team · · 6 min

Engineering teams

In brief

Build a QA team from scratch in this order: first an experienced test lead who sets the strategy and the process, then testers who know the system's domain, and add automation only once you know which tests you repeat in every release. In the first 90 days set up four processes: defect reporting and handling, a test plan for the release, environments with test data, and a regression suite. Performance and security testing are often better ordered as separate projects than covered by permanent hires.

What roles a testing team has

The ISTQB Foundation Level syllabus describes two principal roles in testing: a test management role, responsible for the process, the team and decisions about testing, and a testing role, responsible for the technical side of testing. In practice these two roles grow into several positions:

RoleWhat they doWhen you need it
Test lead or test managerstrategy, test plan, reporting to the business, the “do we release” decisionfrom day one
Test analystrequirements analysis, test case design, functional and exploratory testing, acceptance testing with the businessfrom day one
Test automation engineertest framework, API and UI tests in CI/CD, test maintenancewhen regression takes too much manual time
Performance test engineerload scenarios, bottleneck analysisbefore a traffic peak or a major architecture change
Security testerpenetration tests, configuration reviewbefore an audit or the release of a public API

The difference between a test lead and a test manager is covered in the article Test manager vs test lead. In a small team they are usually the same person.

Hiring order

1. A test lead. The first person decides everything that comes later: tools, how defects are reported, release criteria. Look for someone who has built a testing process before, not just worked within one. Ideally they spend their first month testing, because only then will they see where the system really breaks.

2. Test analysts who know the domain. In a banking, policy administration or billing system most serious defects sit in business rules: interest calculation, tariffs, settlements. A tester who knows the domain finds them faster than one who only knows the tools. Size the number of analysts to the number of development teams and the release frequency, not to a ratio copied from another company.

3. A test automation engineer. Start automating with tests you repeat in every release and that rarely change, ideally at the API layer rather than the UI. How to choose the first tests to automate is covered in the article Test automation: where to start.

4. Periodic skills. Performance and security testing are needed a few times a year, before specific events. A permanent position for that work rarely pays off. It is better to order them as a project with a clear goal and a report.

A common mistake is starting with automation. A team without a strategy and without organized test cases automates chaos: tests are flaky, nobody knows what they check, and regression is still done by hand.

The first 90 days: four processes

PeriodProcessOutcome
Days 1–30defect reporting and handlingone report template, defect classes, a ticket lifecycle agreed with developers
Days 1–30a test plan for the next releasescope, risks, entry and exit criteria
Days 31–60environments and test dataa stable test environment, rules for preparing data without production data
Days 61–90a regression suitea list of tests run in every release, ordered by risk, the first automated tests

Defect reporting comes first, because collaboration with developers depends on it. A good defect report has steps to reproduce, expected and actual results, the environment and evidence. Details in the article How to write a bug report.

The test plan for the first release does not have to be long. What matters is that it says what we test, what we do not test and why, with the order driven by risk. More on this in the article Test plan and test strategy.

Test data at banks, insurers and telecoms is usually customers' personal data. Copying production to a test environment without anonymization is a GDPR risk. The methods are covered in the article Test data and the GDPR.

Regression closes the first quarter. After three releases you can see which areas break most often, and those go into the core of the regression suite.

Tools: fewer, but shared

Three tools are enough to start: a ticketing system shared with developers (a separate system for testers splits the team), a place for test cases linked to requirements, and one automation tool that fits the application's technology. Choosing a UI testing tool is covered in the article Playwright, Cypress or Selenium.

More important than the tool choice is that automated tests run in the same CI/CD pipeline that builds the application. A test someone runs by hand once a week goes stale within a few sprints.

Growing the team and a shared vocabulary

A team assembled from people from different companies and industries speaks different languages: one calls a “test case” a scenario, another a script. A shared vocabulary speeds up the work. The ISTQB Foundation Level syllabus provides it, describing the test process, test design techniques and test management in one framework. You can take the exam at our accredited exam center, remotely or in person.

You can also build the team from people the company already has: business analysts, technical support and customer service staff who know the system from the customer's side. An example of that route is the program retraining employees as software testers. When you need an experienced team right away, you can combine test and automation engineers from our capabilities with your own people.

Questions and answers

How many testers do you need per development team?

There is no single ratio. The number depends on the system's risk, the release frequency, the level of automation and how many tests the developers write themselves. A payment system released weekly needs more testing than an internal reporting tool. Start with one test analyst per development team and after a quarter assess whether testing keeps up with the changes.

Should the first tester start automating right away?

Usually not. First you need to know what to test and which tests recur in every release. Automation without that knowledge produces many flaky tests that nobody maintains. Spend the first weeks on manual and exploratory testing and on organizing test cases, then start automation with stable API tests.

When should you hire a test manager rather than a test lead?

A test manager is needed when testing spans several teams, systems or vendors and has to be pulled into one schedule and one report for management. With one team and one product a test lead who also tests is usually enough. In programs that replace large systems both roles often exist at the same time.

Does a testing team need ISTQB certification?

It is not required by law, but it gives the team shared terms and a grounding in test techniques. When building a team from scratch that speeds up agreeing the process. Some tenders and requests for proposals also require certification from testers, so it is worth having at least for the lead and some of the analysts.

What it looks like in a project

Building a team for a project? We'll propose a lineup within 24 hours.

Let's talk

Read more: Engineering teams