In brief

A test strategy describes how an organization or program always tests: test levels and types, the approach to risk, automation, environments, reporting rules. A test plan describes how this particular project or release will be tested: scope, schedule, people, entry and exit criteria, risks. The strategy changes rarely and applies to many projects. A plan is written for each project and evolves with it. The plan applies the strategy and records any deviations from it explicitly.

Test strategy: what it is and what it contains

A test strategy is a description of how testing is performed to reach the test objectives under given circumstances. It is usually set at the level of the organization or program, and in a specific project it is translated into a test approach, meaning the way test tasks are carried out in that project. The ISTQB Advanced Level Test Management syllabus has a separate chapter on the project test strategy: choosing the approach, analyzing the organizational strategy and project context, and defining test objectives.

A good strategy answers the questions every new project would otherwise ask from scratch:

  • Test levels and types. Who writes unit tests, who runs integration, system and acceptance testing, when performance and security testing happen.
  • Approach to risk. How product risk is assessed and how it translates into test depth.
  • Automation. What is automated by default, at which layers, with which tools and how tests run in CI.
  • Environments and data. Which environments are shared, how test data is restored, how personal data is protected.
  • Defects and reports. The severity and priority scale, the defect lifecycle, the test report format.
  • Independence. Which tests require people from outside the team that built the system.

A strategy should fit on a few pages. When it runs to fifty, nobody applies it, and projects write their own rules from scratch anyway.

Review the strategy after every major program and after a serious production incident. The control question is whether projects apply it without deviations, or whether each one records the same exceptions in its plan. A recurring exception is a sign that the strategy does not match reality and needs to change rather than be enforced.

Test plan: what it is and what it contains

A test plan describes the objectives, resources and test processes for a specific project or release. According to the ISTQB Foundation Level 4.0 syllabus, a plan typically covers:

  • the context of testing: scope, objectives, constraints, the test basis (requirements, user stories, the contract);
  • assumptions and constraints of the project;
  • stakeholders: roles, responsibilities, training and hiring needs;
  • communication: forms and frequency of reporting, document templates;
  • a risk register: product risks and project risks;
  • the test approach: test levels, types and techniques, test deliverables, entry and exit criteria, independence, metrics to collect, data and environment requirements, deviations from organizational practices;
  • budget and schedule.

The syllabus stresses that a plan also helps the team think about future challenges: risks, schedule, people, tools, costs. Writing the plan is therefore part of the work, not just a formality.

The differences in one table

AttributeTest strategyTest plan
QuestionHow do we always test here?How will we test this project?
ScopeOrganization, department, programProject, release, test level
AuthorQuality lead or test managerThe project's test manager or test lead
ChangesRarely, after a process reviewOften, together with the project
ContentPrinciples, levels, automation, environments, reportsScope, schedule, people, risks, exit criteria
SpecificsNo dates or namesDates, names, environment names
AudienceAll teams and vendorsProject team, project manager, the business

A simple test: if a sentence would still be true in the next project, it belongs in the strategy. If it contains a date, a system name or a person's name, it belongs in the plan. Who writes each document in larger programs is described in the article test manager vs test lead.

How to write a test plan that someone will read

A test plan is often written at project kickoff, runs to dozens of pages and is never opened again. To keep it in use, stick to a few principles.

  1. Refer to the strategy instead of copying it. The plan contains only what is different or specific in this project.
  2. Start with scope and risks. The first page says what we test, what we do not test and why. The order and depth of testing follow from the analysis described in the article on risk-based testing.
  3. Write measurable exit criteria. For example: all critical scenarios executed, zero open critical defects, known major defects accepted by the product owner. Without this, the release decision turns into an argument.
  4. Name the dependencies. Environments, access to partner systems, data, test windows with vendors. These are what most often push the schedule.
  5. Update the plan at every significant change. A version with a change history says more than the version from day one.

In large rollouts the test plan is tied to acceptance of the work: the exit criteria of acceptance testing often become acceptance criteria in the contract. That link is described in the article on acceptance of work in an IT project. An example of a plan spanning several vendors and test levels is end-to-end testing of a new card system rollout.

Strategy and plan in agile projects

In Scrum teams a full plan document for every sprint makes no sense. Test planning does not disappear, though, it just changes form. The strategy stays a document, because it applies to all teams and answers questions about automation, environments and test proportions, which the article on the test pyramid discusses. The plan is spread across several places:

  • a release or quarterly test plan: scope, risks, tests that need coordination, for example performance or integration with a partner system;
  • acceptance criteria in user stories and the team's definition of done;
  • test tasks in the sprint plan.

The ISTQB Foundation Level syllabus describes test planning in an iterative approach at two levels: release planning and iteration planning. That is a good frame even for teams that never use the term “test plan”.

Questions and answers

Does every project need a separate test plan?

Every project needs test planning, but not always a separate document. In a small project a wiki page is enough: scope, risks, exit criteria, environments and people. In a large program with several vendors or regulatory requirements a full plan is necessary, because the auditor and the steering committee expect a decision trail.

Who approves the test plan?

Usually the project manager and the product owner or a business representative, because the plan states what will not be tested and which risks remain. In programs with vendors the contract parties also approve the plan when test exit criteria double as acceptance criteria. The test manager or test lead prepares the plan and is responsible for keeping it up to date.

What is the difference between a test strategy and a test approach?

A test strategy usually sets the principles for a whole organization or program. A test approach is the way those principles are applied in a specific project, taking its risks and constraints into account. The ISTQB Foundation Level syllabus places the test approach inside the test plan as one of its parts.

How long should a test plan be?

As short as the project allows. A plan that refers to the strategy and describes only what is different in the project usually fits on a few pages. Length does not measure quality. A better check is whether the plan answers three questions: what we test, what we do not test and when we consider testing complete.

What it looks like in a project

Planning testing for your project? Talk to a test manager.

Let's talk