The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- The quality of test cases and defect reports is uneven, and an internal audit pointed to the lack of a consistent methodology.
- Approach
- A competence diagnosis at the start shows who needs the basics and who needs the advanced modules.
- Goal
- ISTQB exam pass rate in the group: target set after the competence diagnosis; Competence gain after the program: an increase in the competence test score.
Client context
In banking, the cost of a production defect is measured not only in complaints but also in customer trust and supervisory findings. Since January 17, 2025, DORA has applied, moving the conversation about IT quality from the IT department to the board. The client is a bank with a dispersed team of testers across several departments, some with many years of domain experience but without formal training in testing techniques.
Challenge
The quality of test cases and defect reports is uneven, and an internal audit pointed to the lack of a consistent methodology. The bank wants to introduce a shared standard and confirm competence with a certificate.
Requirements and constraints
- Recommendation D of the KNF (Polish Financial Supervision Authority) sets out the supervisor's expectations for managing information technology and the security of the ICT environment in banks: separation of environments, change control, access management and business continuity. Every change in the system must go through a test and acceptance path that can be shown to an auditor. (source)
- DORA, the Digital Operational Resilience Act (Regulation (EU) 2022/2554), requires ICT risk management, a register of contracts with ICT providers, classification and reporting of major incidents, and regular testing of operational resilience. For the project this means every new component needs an owner, a dependency map and a resilience test scenario, and the provider (including us) goes into the register of information on contractual arrangements. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, every deliverable handed over with documentation the client's team can take over.
Approach and architecture
We combine in-person training with practice on the project: after each module, participants complete an assignment in their own team, and the trainer reviews it during consultations. We measure progress not by the number of hours but by the change in the quality of artifacts: test cases, defect reports and automated scripts.
A competence diagnosis at the start shows who needs the basics and who needs the advanced modules. We run the ISTQB Foundation and Advanced Test Analyst courses on anonymized examples from the bank's systems, and after each module participants improve their own test cases with the trainer's consultation. The program ends with exams at our accredited exam center.
Key elements of the solution:
- Knowledge diagnostic test and a practical assignment
- Paths: Foundation, Test Analyst, automation, performance testing
- Consultations on real artifacts
- Exams remotely or at our office in Warsaw
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| ISTQB trainer | 2 | training, consultations, exam preparation |
| Test manager (ISTQB Advanced) | 1 | test strategy, entry and exit criteria, quality reporting |
| Project manager | 1 | plan, budget, risks, communication with the steering committee |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Competence diagnosis | 1–2 | competence map, learning paths |
| 2. Foundation training | 3–7 | ISTQB Foundation modules, practice |
| 3. Specialist training | 8–12 | automation, performance, API |
| 4. Exams and certification at our exam center | 13–14 | exams, certificates |
| 5. Impact assessment and development plan | 15–16 | competence change report |
Technology stack
ISTQB materials, Jira Xray (exercises), Selenium, JMeter, SoapUI.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Low user adoption | champions in each department, training on their own cases, usage measured from day one |
| Diverging stakeholder expectations | stakeholder map, a shared definition of success, monthly steering committee |
| Scope creep during the project | backlog with MoSCoW priorities, every change goes through the committee with an assessment of the schedule impact |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| ISTQB exam pass rate in the group | target set after the competence diagnosis | certification exam results |
| Competence gain after the program | an increase in the competence test score | entry and exit test |
| Defect detection effectiveness (DDE) | ≥ 90% | defects found in testing / all defects within 90 days |
Lessons learned and good practices
Exercises on participants' own test cases produce a change that is visible in projects after the very first module. A shared ISTQB vocabulary shortens discussions with developers about whether something is a defect. A shared ISTQB vocabulary shortens discussions between testers, developers and the business.
Why B2B.net
We combine two models: we provide individual engineers and whole teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies and experience with ISO 27001, DORA and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.
Acceptance criteria
Each phase ends with a formal acceptance against criteria agreed at the start. In this engagement, acceptance covers: the competence map and learning paths; the ISTQB Foundation modules and practice; automation, performance and API training; exams and certificates; the competence change report. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.
Next step
Want to see what such an implementation would look like in your organization? Book a 30-minute call. We will prepare a plan for the first six weeks and a team composition tailored to your system.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.