Business continuity: BCP and DRP for critical systems

B2Bnetwork team · · 6 min

Regulations

In brief

A business continuity plan (BCP) says how a company keeps its most important processes running during a disruption, and a disaster recovery plan (DRP) describes how to restore IT systems within the time and with the data loss the business has accepted (RTO and RPO). Both plans are mandatory for financial entities under Articles 11 and 12 of DORA and for entities covered by NIS2 under Article 21. DORA requires testing the plans at least once a year and after significant changes.

BCP and DRP: two plans, one question

Both plans answer the question of what we do when something stops working, but at different levels.

BCPDRP
Levelbusiness processessystems, data, infrastructure
Ownerbusiness, management boardIT
Example contentworking manually, substitute service channels, communication with customersrecovery order, failover procedures, restore from backup
Measurehow long a process can be downRTO, RPO

A bank example: when the loan system is down, the BCP says branches accept applications on paper forms and pass them to headquarters once the system is back, and the DRP says in what order administrators restore the database, the application servers and the integration with the credit bureau. The plans do not work without each other: a DRP without a BCP does not know what matters, and a BCP without a DRP does not know when the systems will be back.

NIST SP 800-34 Rev. 1 describes contingency planning for information systems and is a good reference point for an IT team, including outside US government.

Impact analysis, RTO and RPO

A plan starts with a business impact analysis (BIA). For each process you determine the consequences of downtime after an hour, a day and a week, which systems the process depends on and what data is essential. The analysis yields two numbers for each system:

  • RTO (recovery time objective): the maximum time from failure to restoring the service.
  • RPO (recovery point objective): the maximum amount of data the company can lose, expressed as time since the last recovery point.

Example values for a telecom operator, given as an illustration and not a standard:

SystemRTORPOResult for the architecture
service and SIM card activation1 h5 minreplication to a second site, failover with a procedure
billing (charging)8 h15 minevent records buffered and processed after recovery
self-service portal4 h1 hrestore from backup, static page with information
data warehouse72 h24 hnightly backup

The business sets RTO and RPO, but IT must show the cost of each value. An RPO close to zero requires synchronous replication, which has a price and a performance impact. An honest conversation about the numbers avoids a plan that promises an hour and in practice needs a day.

Recovery architecture: from backups to a second site

  • Backups with a copy isolated from the production environment, which an attacker with administrator privileges cannot change or delete. Ransomware increasingly targets backups first.
  • Replication shortens RTO and RPO but does not replace backups: an erroneous deletion or encryption of data is replicated to the second site within seconds.
  • A second site makes sense only if it has the capacity to take over traffic. It is worth checking this in capacity planning (see Capacity planning for transactional systems).
  • Infrastructure as code lets you rebuild the environment from a repository instead of from an administrator's memory.

Article 12 of DORA requires financial entities to have backup policies, restoration procedures and methods, and, when restoring data from backups, to use systems that are physically and logically segregated from the source system. Article 11 requires an ICT business continuity policy and response and recovery plans. Article 21 of NIS2 explicitly lists business continuity, backup management, disaster recovery and crisis management.

Testing the plans: from a table-top review to a site failover

Article 11(6) of DORA requires testing business continuity plans and response and recovery plans at least once a year and after substantial changes to systems supporting critical or important functions. It is worth testing in stages:

  1. Document review with the system owners: are contacts, addresses and procedures up to date.
  2. Table-top exercise: the team walks through a scenario, for example the loss of a data center on a Friday-to-Saturday night, and checks decisions, roles and communication.
  3. Restore from backup in an isolated environment, with timing and a data consistency check.
  4. Failover of a selected system to the second site in a maintenance window, and back.
  5. Full failover of a critical function, planned with the business and vendors.

Every test ends with a report: achieved RTO and RPO, deviations from the plan, fixes with deadlines. At an operator, failovers are planned in night maintenance windows, which is described in Night work and maintenance windows at a telecom operator. Test results are also evidence in the testing program described in the article Digital resilience testing under DORA.

Typical gaps in plans

  • Dependencies nobody remembers: DNS, the directory service, the time server, the key vault, licenses. A system restored without them will not come up.
  • Vendors outside the plan: an outage at a cloud or maintenance provider requires their participation, and the contract does not provide for taking part in tests.
  • People: the procedure assumes one administrator who knows the emergency password.
  • Outdated documentation: the plan describes the architecture from before two migrations.
  • No decision on declaring a disaster: nobody knows who triggers the DRP and when.

An incident that triggers the plan often also has to be reported to the supervisor or CSIRT, as described in the article Incident reporting: DORA and NIS2 in one place. An example of moving an operator's systems to a platform that makes recovery easier is in the scenario Kubernetes platform for an operator's network functions and IT systems.

Questions and answers

How often should a disaster recovery plan be tested?

Financial entities covered by DORA test business continuity plans and response and recovery plans at least once a year and after substantial changes to systems supporting critical or important functions. Outside the financial sector a similar rhythm is sensible practice, with more frequent backup restore tests for the most important systems.

Does replication to a second site replace backups?

No. Replication protects against hardware or site failure, but it also carries over errors: an accidental deletion or ransomware encryption will appear in the replica almost immediately. A backup with version history and isolated storage lets you return to the state before the event.

Who sets RTO and RPO?

The business process owner, based on the business impact analysis. IT presents what each value costs and what the architecture looks like for it, and the board approves the result if it requires investment. Values set without IT are often unrealistic, and values set by IT alone do not match business needs.

Does moving systems to the public cloud solve the recovery problem?

Not by itself. The cloud makes it easier to build a second site in another region, but responsibility for backups, configuration and restore testing stays with the company. You also need to plan for a failure of the provider or the region itself and, in the financial sector, the exit strategy under Article 28 of DORA.