The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Every team maintains its own clusters and deployment processes, and updates are manual and risky.
- Approach
- We build an internal Kubernetes platform in the operator's own data centers, with service templates, GitOps and central observability.
- Goal
- Deployment frequency: on demand, at least weekly; Service restoration time: < 1 h for P1 incidents.
Client context
Telecom operators serve millions of customers on BSS/OSS systems that have grown over decades. Every change to a tariff, number porting process or service activation touches many systems at once. The client is a telecom operator modernizing its IT systems and some network functions toward a cloud architecture in its own data centers.
Challenge
Every team maintains its own clusters and deployment processes, and updates are manual and risky. Critical infrastructure security requirements limit the use of the public cloud.
Requirements and constraints
- NIS2, i.e. Directive (EU) 2022/2555, and the amendment to the Polish National Cybersecurity System Act (KSC) require essential and important entities to implement cybersecurity risk management measures, supply chain security and incident reporting within short deadlines (early warning within 24 hours). Management is personally liable, so documenting decisions is part of the product. (source)
- The Polish National Cybersecurity System Act defines the obligations of operators of essential services, including incident handling, cooperation with CSIRT and security audits every two years. The project must provide for an incident reporting procedure and audit trails. (source)
- The Polish Electronic Communications Law regulates, among other things, the confidentiality of communications, number portability, protection of traffic data and information obligations toward subscribers. Changes to BSS/OSS systems must preserve these processes without interruption. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, every deliverable accompanied by documentation that the client's team can take over.
Approach and architecture
We describe infrastructure exclusively as code (Terraform, Helm), and changes go through review and a pipeline like any other code. The platform is built around a landing zone with separate subscriptions or accounts, central logging, policy as code and secrets management. We migrate applications in waves along the 6R path (rehost, replatform, refactor, etc.), starting with low-risk systems so the team builds proficiency.
We build an internal Kubernetes platform in the operator's own data centers, with service templates, GitOps and central observability. Cluster upgrades are automated and tested on a canary cluster.
Key elements of the solution:
- On-premises Kubernetes clusters managed through GitOps
- Service templates for teams
- Central observability
- Automatic upgrades with a canary cluster
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Cloud architect | 1 | landing zone, network, cloud security, costs |
| DevOps engineer | 3 | CI/CD pipeline, infrastructure as code |
| SRE engineer | 2 | observability, SLOs, incident procedures |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Readiness assessment and migration plan | 1–6 | inventory, 6R paths, business case |
| 2. Landing zone and security | 7–14 | accounts/subscriptions, network, IAM, policies |
| 3. Migration in waves | 15–30 | migrated applications, runbooks |
| 4. Optimization and FinOps | 31–36 | right-sizing, cost report |
| 5. Operations handover | 37–40 | documentation, on-call, training |
Technology stack
Kubernetes (OpenShift or Rancher), Argo CD, Helm, Prometheus, Loki, Tempo, Vault.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Knowledge held by individuals | pair programming, documentation in the repository, a succession plan for key roles |
| Service downtime during changes | blue-green or canary deployments, feature flags, maintenance windows agreed with the business |
| Low adoption by users | champions in each department, training on their own cases, usage measured from day one |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Deployment frequency | on demand, at least weekly | CD pipeline |
| Service restoration time | < 1 h for P1 incidents | ticketing system |
| Service availability | ≥ 99.9% per month | synthetic monitoring, SLOs |
Lessons learned and good practices
An internal platform makes sense when teams want to use it, so the templates must be simpler than their own solutions. A canary cluster lets you upgrade without fear. A landing zone done properly at the start speeds up every subsequent migration wave.
Why B2B.net
B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audits are a daily reality: in banks, insurers and critical infrastructure. We are an accredited exam center, so testing methodology is not a claim for us but a working standard. We give a first proposal of engineers within 24 hours, and a team can start in 5 business days.
Acceptance criteria
Each phase ends with formal acceptance against criteria agreed at the start. In this implementation, acceptance covers: inventory, 6R paths, business case; accounts/subscriptions, network, IAM, policies; migrated applications, runbooks; right-sizing, cost report; documentation, on-call, training. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.
Next step
Let's talk about your project. Within 24 hours we will get back to you with a quote or a proposal of engineers; a team can start in 5 business days. Contact: office@b2bnetwork.pl.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.