The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Hundreds of automated scripts were created in different tools and nobody knows how many of them work.
- Approach
- We build TestFactory: a shared framework, a repository of business steps, a test data catalog and a run schedule.
- Goal
- Full regression time: from days to hours, target ≤ 8 h; Share of automated regression cases: ≥ 70% of critical paths.
Client context
Telecom operators serve millions of customers on BSS/OSS systems that have grown over decades. Every change to a tariff, number porting process or service activation touches many systems at once. The client is a telecom operator with a dozen or so teams developing BSS/OSS systems, a customer portal and an app, each with its own test scripts.
Challenge
Hundreds of automated scripts were created in different tools and nobody knows how many of them work. End-to-end tests of processes (service activation, number porting, tariff change) require coordination across several teams.
Requirements and constraints
- The Polish Electronic Communications Law regulates, among other things, the confidentiality of communications, number portability, protection of traffic data and information obligations toward subscribers. Changes to BSS/OSS systems must preserve these processes without interruption. (source)
- The GDPR, i.e. Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, data processing agreements and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- NIS2, i.e. Directive (EU) 2022/2555, and the amendment to the Polish National Cybersecurity System Act (KSC) require essential and important entities to implement cybersecurity risk management measures, supply chain security and incident reporting within short deadlines (early warning within 24 hours). Management is personally liable, so documenting decisions is part of the product. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, every deliverable accompanied by documentation that the client's team can take over.
Approach and architecture
We build automation following the test pyramid: the most tests at the unit and API level, fewer at the UI level, and end-to-end scenarios only for critical business paths. The framework is built as a product (with code reviews, versioning and documentation) and runs in the CI pipeline from the first sprint, so the development team gets feedback in minutes, not after a week.
We build TestFactory: a shared framework, a repository of business steps, a test data catalog and a run schedule. We review the existing scripts and migrate only those that have value. End-to-end processes are assembled from steps maintained by the owning teams.
Key elements of the solution:
- A shared framework with a step library per system
- A test data catalog (numbers, subscribers, SIM cards) with reservations
- Orchestration of end-to-end tests across systems
- A quality dashboard for every team and process
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Solution architect | 1 | target architecture, ADR decisions, technical reviews |
| QA lead | 1 | organizing testers' work, test case reviews, defect metrics |
| Test automation engineer | 5 | framework, scripts, CI integration |
| DevOps engineer | 1 | CI/CD pipeline, infrastructure as code |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Regression audit and candidate selection | 1–4 | automation map, cost-benefit analysis |
| 2. Framework build and CI integration | 5–11 | framework, pipeline, test code standard |
| 3. Automating critical paths | 12–24 | smoke and regression suites |
| 4. Stabilization and reporting | 25–31 | quality dashboard, quarantine of flaky tests |
| 5. Handover and team training | 32–36 | documentation, workshops, maintenance plan |
Technology stack
Java, Selenium, REST Assured, Robot Framework, Jenkins, PostgreSQL, Grafana.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Low adoption by users | champions in each department, training on their own cases, usage measured from day one |
| Flaky automated tests | test quarantine, root cause analysis, stable selectors and independent data |
| Unavailable or unstable test environments | environment booking schedule, virtualization of external services (mocks), a daily environment smoke test |
| No test data without personal data | a synthetic data generator and masking that preserves referential integrity; a ban on copying production into tests |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Full regression time | from days to hours, target ≤ 8 h | suite execution time in CI |
| Share of automated regression cases | ≥ 70% of critical paths | test repository |
| Share of flaky tests | < 2% | pipeline report (tests with varying results) |
Lessons learned and good practices
A shared framework makes sense only if the teams own their steps. A test data catalog with reservations eliminates conflicts between teams testing in parallel. A flaky test is worse than no test, because it undermines trust in the whole suite.
Why B2B.net
B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audits are a daily reality: in banks, insurers and critical infrastructure. We are an accredited exam center, so testing methodology is not a claim for us but a working standard. We give a first proposal of engineers within 24 hours, and a team can start in 5 business days.
Acceptance criteria
Each phase ends with formal acceptance against criteria agreed at the start. In this implementation, acceptance covers: automation map, cost-benefit analysis; framework, pipeline, test code standard; smoke and regression suites; quality dashboard, quarantine of flaky tests; documentation, workshops, maintenance plan. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.
Next step
Facing a similar challenge? Write to office@b2bnetwork.pl or call +48 577 317 312. You get a first proposal of engineers or a plan for the first step within 24 hours.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.