In brief
You choose a collaboration model by who is to direct the work day to day and who is responsible for the result. When you have your own team and it lacks one competence, an engineer who joins your backlog and meetings is enough. When a whole function is missing, for example testing or a platform, a team with a lead on the IT company's side is better. When you can describe the outcome rather than the staffing, order a project with a scope and acceptance criteria.
Three models in one table
The models differ in how responsibility is divided, not in which people work in them. The same integration engineer can work in any of them, but in each someone different sets their tasks and someone different signs off on the result.
| Model | Who directs the work | Who is responsible for the result | Billing | When it fits |
|---|---|---|---|---|
| An engineer on your team | your lead or product owner | you; the engineer for the quality of their own work | time worked | one role is missing, and the process works |
| A team | the IT company's team lead, priorities from you | you for priorities, the IT company for the staffing and way of working | the team's time worked | a whole function is missing: testing, DevOps, analysis |
| A project | the IT company's project manager | the IT company for scope and deadline, you for decisions and acceptance | scope and phases | the goal can be described and verified |
Scale comes on top of this. One person, a team of several or a dozen people, and a service center with several dozen engineers are three different ways to organize work. A company opening a center in Poland can entrust the running of a team to an IT company or ask it to recruit people for its own payroll.
An engineer on your team: when it is enough
One engineer is enough when your team has a technical lead, code review, and an organized backlog, and lacks just one competence. An example: a bank's team develops online banking in Java and is tasked with connecting a new payment system through Kafka. Nobody on the team has done event-driven integration before, so an engineer who has done it joins and works in the same sprint rhythm as the rest.
This model takes your time. Someone has to introduce the engineer to the system, give them access, review their code, and answer questions about the domain. We describe how to plan this in the article An engineer's first 30 days on a project.
The most common mistake is expecting one outside person to fix a process that does not exist. If the team has no code review and no shared definition of done, the new engineer will adopt the existing habits instead of changing them.
A team: when a whole function is missing
You choose a team when you lack a whole function, not one person. A typical example is testing: a telecom operator before migrating its billing system needs testers, test automation engineers, and someone to lay out a test plan. Building such a group from scratch takes months, and during a migration nobody has the time.
In this model you share responsibility. You set the priorities, the criteria for done, and access to environments. The IT company is responsible for the staffing, replacements, working methods, and for the team continuing to function when someone is sick or leaves. The team lead is your single point of contact for day-to-day matters. How this looks in practice is shown in the scenario a team of testers and automation engineers for a software vendor.
A team also works where the work is continuous but not part of your core business: maintaining a domain system, a service desk at night and on weekends, a cloud platform. You then have a predictable cost and do not manage each person separately.
A project: when you can describe the outcome
You order a project when you can describe what should work at the end and how you will check it. An example: a factory wants orders from the ERP to go automatically to the MES system, and production statuses to return to the ERP. This can be described with a scope, a list of cases to verify, and a deadline. The IT company then takes responsibility for the team's staffing, the plan, and the result, and you for decisions and acceptance.
A project with a fixed scope handles uncertain requirements poorly. If halfway through it turns out that the ERP has three different order formats, every change goes through a separate estimate and an amendment. If you do not yet know the requirements, start with a short analysis phase that ends with a description of the scope, and only then order the implementation.
Good examples of projects are work with a clear end: a performance test before a peak (we describe it in the article A performance test before a sales peak), a data migration, security testing before an audit, the integration of two systems.
Five questions before choosing
The answers to five questions usually point to the model on their own:
- Who on your side sets priorities every day? If nobody has the time, an engineer on your team will wait for tasks. Choose a team with a lead or a project.
- Can you write acceptance criteria? If so, a project is possible. If not, start with an analysis or with a team.
- How long will the work last? Continuous work with no clear end fits a team better than a series of projects.
- What happens when someone leaves? Agree who looks for a replacement and how fast. At B2Bnetwork, a replacement is in place within 5 days.
- Does the knowledge have to stay with you? If your own team is to develop the system afterward, plan knowledge transfer from day one. We write about this in the article Knowledge transfer when the team changes.
The models can be combined and changed along the way. A common path is to start with one engineer and, after a few months, when it is clear how much work there really is, expand to a team with a lead.
Questions and answers
Can you start with one engineer and move to a team?
Yes, and it is a common path. One engineer lets you test the collaboration on a small part of the system, and you see how much work there really is. As the scope grows, more people and a team lead are added. It is worth agreeing in the contract from the start how people are added and how the division of responsibility changes, so that the transition does not require new negotiations.
Who is responsible for code quality when an engineer works on my team?
The engineer is responsible for the quality of their own work, and your team for the standard it is judged against: code review, tests, the definition of done. The IT company is responsible for sending a person with the competencies from the role description, and for reacting when the collaboration is not working. It is worth writing the criteria down before the start.
How is a project different from a team, if the same people can work in both?
It differs in who takes on the risk. In a team you pay for time worked and decide yourself what the team works on. In a project you pay for a fixed scope, and the IT company is responsible for delivering it on time. That is why a project requires a more precise description at the start, while a team gives more freedom along the way.
How long does it take to start in each model?
With an engineer and with a team, the start time depends mainly on conversations and formalities. At B2Bnetwork you get a staffing proposal within 24 h, and people start within 5 business days. A project starts later, because you first have to agree on the scope, schedule, and acceptance criteria, and with unclear requirements go through a separate analysis phase.