In brief
The first 30 days decide whether the engineer quickly starts contributing or spends a month waiting for access. Sort out access, equipment and the contract before day one. In the first week, give them a small, real task that goes all the way to release. In the following weeks, widen the scope of work and name one person for questions. After 30 days, talk about what works and what blocks the work.
Before day one: access, equipment, contract
Most time is lost before the start, not during it. At banks and telecom operators, access to the VPN, the repository and the test environment alone requires several requests and approvals from different departments. If you start filing them on the start date, the engineer will spend the first week reading documentation.
A checklist to close before day one:
- contract and non-disclosure agreement (NDA) signed,
- domain account, e-mail and the team messenger,
- equipment: a client laptop or approval for their own, with the required software,
- VPN, code repository, task tracker and documentation,
- development and test environments, with test data,
- invitations to team meetings for the first two weeks.
It is also good to send the engineer a short package before the start: an architecture diagram, a list of team members with their roles and a description of the first task. On day one they then arrive with questions, not only with first impressions.
At B2Bnetwork we prepare the contract, NDA, accounts and laptop in the week between selecting the candidate and the start, so the engineer begins with work, not with requests. We describe separately how access and security rules work in banking in the article An engineer on a banking project.
Week 1: environment and a first small change
The goal of the first week is one small change that goes the whole way: from the task through code review and tests to release on the test environment. It can be an error message fix, a new field in a report or a missing test for an existing function. The value of the change is secondary. What matters is that the engineer learns the process and along the way finds what does not work: a missing permission, an outdated build guide, a test that fails for no reason.
Three more things help in the first week:
- A buddy from the team. One person who can be asked about anything, with a short fixed time for questions every day. Without one, a new engineer asks too little because they do not want to disturb anyone.
- An hour with the architect or lead. A one-page picture of the system: modules, integrations, databases, where data comes from and where it goes.
- Running the system locally. If it takes longer than a day, write down the obstacles. That is the first documentation fix.
Weeks 2–3: real work and code review
In the second week the engineer takes tasks from the current sprint, smaller ones first, then increasingly larger. Code review is then the main way to learn: the comments teach them conventions that are not in the documentation and decisions the team made long ago.
It is also good if during this time they learn the domain, not just the code. In an operator's billing system this means talking to an analyst about how fees are calculated and where the exceptions come from. In a factory: a visit to the line or a conversation with a process engineer about what the statuses in the MES mean. An hour of such a conversation saves many hours of guessing what the author of the requirements had in mind.
Ask the engineer to write down everything missing from the documentation and to fill it in right away. This list is valuable to every person who comes next. How to make it a regular part of the team's work is described in the article Knowledge transfer when a team member changes.
Toward the end of the third week the engineer can watch a production release or incident handling up close, once, as an observer. In systems with night maintenance windows this is often the only chance to learn the procedure before their own on-call shift. They do not go on call alone yet: approval for the first on-call shift is a good topic for the 30-day conversation.
Week 4: the conversation after 30 days
After a month, talk for half an hour with three people: the engineer, the team lead and, if the engineer works through an IT provider, its client manager. Three questions are enough:
- What is the engineer already doing independently?
- What is blocking them: access, knowledge, priorities, people?
- What do they need to take over the tasks from the role description in the next 60 days?
The lead says, for their part, whether the pace and quality of work match expectations. It is best to refer to the tasks that were in the role description, not to a general impression. At the end, write down two or three goals for the next two months.
Signs that something is going wrong
Most problems are visible in the first two weeks if you know what to look for.
| Signal | What it usually means | What to do |
|---|---|---|
| No repository access after a week | requests were filed too late | name a person who will push the approvals through |
| The engineer asks no questions | they do not know whom to ask or do not want to disturb | a buddy and a fixed time for questions |
| Changes come back from review several times | team conventions are not written down | write them down, pair for a while |
| Only minor fixes after three weeks | tasks are too large or the team does not trust the newcomer | split the task, give one whole |
| The work is good, but it is the wrong work | unclear priorities | one person sets the order of tasks |
If after a month it is clear the engineer does not fit the project, it is better to say so right away than to wait a quarter. At B2Bnetwork a replacement is ready in 5 days. For large starts, when dozens of people join at once, part of the onboarding is worth moving to before day one, as in the scenario expanding a bank's competence center, where the team was trained in the required technologies before the project started.
Questions and answers
How much time should the team devote to a new engineer?
The most in the first week: the buddy should have time reserved for questions every day, and the lead an hour to introduce the architecture. In the following weeks, code review and short conversations are enough. If the team has no time for this at all, consider a team with its own lead instead of a single person.
Does an engineer from an external company go through the same onboarding as an employee?
In the technical part, yes: the same access, documentation, buddy and code review. Security and data protection training should also be the same, because the engineer works on the same systems. HR and equipment matters, handled by the IT provider, differ, for example the contract and the laptop.
When should you assess whether the engineer fits the project?
Make the first deliberate assessment after 30 days, referring to the tasks in the role description. Warning signs show earlier, usually in the first two weeks, and are worth acting on immediately. A full picture of independence comes only after a quarter of work, especially in large systems with a long history.
What should you prepare when several people join a project at once?
A joint introduction to the architecture and process for the whole group, one buddy for two to three people, and access ordered in bulk well in advance. For larger groups it is worth running training in the project's technologies before the start, so the first weeks go into working on the system, not into learning tools.