Knowledge transfer when a team member changes

B2Bnetwork team · · 6 min

Engineering teams

In brief

Knowledge transfer works when it has a plan, an overlap period and a final check. First, list what only the departing person knows: systems, access, recurring tasks, known workarounds. Then plan a period in which the successor first observes, then works alongside the predecessor, and finally does everything alone. Knowledge counts as transferred only when the successor runs a release or handles a typical incident on their own. A handover document alone does not guarantee it.

When knowledge transfer is needed

Knowledge transfer is needed for every change after which a different person is to do what someone else did before. The most common situations are:

  • an engineer leaves the team or the company,
  • an engineer moves to another project in the same company,
  • the IT provider maintaining the system changes,
  • a project ends and your maintenance team takes over the system,
  • you hire directly an engineer who worked through an IT provider.

Each of these situations leaves a different amount of preparation time. A resignation gives you as much as the notice period. A provider change or the end of a project usually gives more, but only if you plan the handover from the start of the cooperation, not in the last month.

The worst case is a system that one person has worked on for years. In banks and insurers this often concerns systems on IBM i or on a mainframe, where the authors of the code are retiring. We write about this separately in the article COBOL and mainframe: how to transfer knowledge before the experts leave.

An inventory of what one person knows

The first step is an inventory, not documentation. Ask the departing person to write down everything they do over several days, and then organize it together into a few groups:

GroupExamples
Systems and moduleswhich modules they own, which only they know
Recurring tasksmonth-end close, certificate renewal, queue cleanup, reports for the regulator
Accessservice accounts, passwords in the vault, keys, permissions at partners
Peoplewho they talk to in the business and at vendors, who decides what
Hidden knowledgeknown workarounds, scripts on their own disk, “this test always fails on Monday”

The last group is the most important and the hardest. Hidden knowledge comes out only when someone else tries to perform the task. That is why an inventory alone is not enough, and an overlap period is needed.

An inventory is useful even when nobody is leaving. A team that checks once a year which tasks only one person can do knows where it is most exposed and can teach a second person in advance.

The overlap: observe, work alongside, do it alone

An overlap is a period in which the predecessor and the successor work at the same time. A well-planned one has three stages:

  1. The successor observes. The predecessor does their work and says aloud what they are doing and why. The successor takes notes and adds to the inventory what is missing from it.
  2. The successor does, the predecessor watches. Roles reverse. The successor performs the tasks, and the predecessor corrects and fills in.
  3. The successor works alone, the predecessor is on call by phone. The predecessor no longer sits next to them, but can be asked.

The length of each stage depends on the system. A module with good documentation and tests can be handed over quickly. A system without tests, with tasks that happen once a month or once a quarter, needs an overlap that covers at least one occurrence of each such task. If only one person does the month-end close, the successor should go through it with them at least once.

Plan the overlap in the calendar, not “as far as possible”. In their last weeks, a departing person usually gets urgent tasks to wrap up, and handover loses to them. Reserve fixed blocks, for example two hours a day, and record the sessions in which the predecessor shows their work. A recording of a release or a month-end close will serve not only the successor but every subsequent person on the team.

Documents that stay

Handover documentation should be short and used, not extensive and forgotten. A few documents are enough:

  • system map: one diagram of modules, integrations and databases, describing where data comes from,
  • operating procedures: release, restart, restore from backup, handling typical incidents, step by step,
  • architecture decisions: what was chosen, what the options were and why this one,
  • known issues: a list of bugs and workarounds, with a note on why they have not been fixed yet,
  • contacts: who on the business side and at vendors decides what.

It is best when these documents are created along the way, not at departure. A team that records decisions from day one transfers knowledge faster. This is one of the working principles we describe in the article A team across several cities. When there is no documentation at all and the authors are gone, the only help is to reconstruct it from the code and from how the system behaves, which we cover in the article Documentation of a legacy system when the authors are gone.

The final check and closing

Handover ends with a check, not with a signature under a document. At the start, agree what the successor must do alone for the knowledge to count as transferred. Examples:

  • independently ran a production release,
  • handled a typical incident following the procedure, without the predecessor's help,
  • performed one recurring task, for example the month-end close,
  • answered the business's questions about how a module works.

After the check, revoke the predecessor's access, move service accounts and passwords to the successor or to the team, and update the contact list. When working with an IT provider, agree in the contract who looks for a successor and how fast. At B2Bnetwork a successor is ready in 5 days, and the client manager stays with you for the whole project. What such a takeover looks like in system maintenance is shown by the scenario a maintenance team for a public administration domain system.

Questions and answers

How long should the overlap be when an engineer leaves?

Long enough for the successor to go through every important task at least once under the predecessor's eye. For a module with tests and documentation it can be a few days. For a system with monthly or quarterly tasks, the overlap should cover their dates, otherwise the successor will do them alone for the first time.

What should you do when the departing person has no time for the handover?

Set priorities: first the tasks nobody else can do and the access nobody else has. Record sessions in which the predecessor shows their work, because that takes the least of their time. The successor reconstructs the rest from the code and the recordings, and in case of doubt asks the predecessor at an agreed time.

How do you transfer knowledge when the IT provider maintaining the system changes?

The same way as when one person leaves, only on a larger scale and with more lead time. The previous provider prepares the inventory, the new one observes, then works under supervision, and finally takes over responsibility. It is worth writing the duty to cooperate on handover into the contract with every provider from the start.

Can you hire directly an engineer who worked through an IT provider?

Often yes, if the contract with the provider allows it. At B2Bnetwork you can hire an engineer directly after 12 months of cooperation. It is a good way to keep knowledge of the system in your team when the project moves into maintenance.