A booking and appointment platform for a chain of service studios

Project write-up

The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.

In brief

Problem
Every location has a different booking system, there is no shared customer database, and no-shows reduce revenue.
Approach
We build a single booking platform with a customer app, a reception panel and specialist schedules.
Goal
Conversion on the key path: an increase over the baseline, target set after the baseline measurement; active users of the solution: ≥ 80% of the target group after 3 months.

Client context

In services, the advantage comes from how fast you respond to the customer, and that depends on whether customer, order and billing data sit in one place. A chain of beauty and physiotherapy studios with over a dozen locations, using several different booking tools.

Challenge

Every location has a different booking system, there is no shared customer database, and no-shows reduce revenue.

Requirements and constraints

  • GDPR, that is Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, data processing agreements and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
  • The European Accessibility Act (Directive 2019/882) and the Polish act on ensuring compliance with accessibility requirements have applied since June 28, 2025 to, among others, consumer banking, e-commerce and communications services. Digital channels must meet accessibility requirements, and failing to do so risks fines and inspections by the market surveillance authority. (source)
  • PCI DSS v4.0 applies to anyone who processes payment card data. Version 4.0 tightens the requirements for multi-factor authentication, scripts on payment pages and penetration testing of segmentation. (source)
  • Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, every deliverable supplied with documentation that the client's team can take over.

Approach and architecture

The first weeks are discovery: user journey mapping, prioritization (MoSCoW) and a clickable prototype tested with real users. Then development in Scrum with a demo every two weeks, continuous integration and deployments to the test environment after every merge. We record architectural decisions in an ADR log, so that years later it is clear why something was done one way and not another.

We build a single booking platform with a customer app, a reception panel and specialist schedules. SMS reminders and one-click rescheduling reduce no-shows, and prepayments are optional for high-value services.

Key elements of the solution:

  • A customer app (web and mobile)
  • A reception panel and specialist schedules
  • Reminders and rescheduling of appointments
  • Payments and prepayments

Team and roles

RoleCountResponsibility
Project manager1plan, budget, risks, communication with the steering committee
UX/UI designer1research, prototypes, usability and accessibility testing
Frontend developer (React/Angular)2interface, accessibility, component tests
Backend developer (Java/Kotlin)2domain services, API, unit tests
Mobile developer (Kotlin/Swift/Flutter)1mobile apps, device security
Test analyst (ISTQB)1designing and executing test cases, reporting defects
Product owner and domain experts (client side)as neededpriorities, business decisions, acceptance

Phased schedule

PhaseWeeksDeliverable
1. Discovery and prototype1–4journey map, backlog, prototype
2. Architecture and foundations5–8ADRs, skeleton, CI/CD
3. Iterative development9–19an increment every sprint, demos
4. Stabilization and acceptance testing20–23UAT, security and accessibility testing
5. Deployment and post-launch support24go-live, hypercare, handover

Technology stack

React, React Native, Node.js, PostgreSQL, a payment gateway, an SMS gateway.

Risks and how we mitigate them

RiskHow we mitigate it
Scope creep during the projecta backlog with MoSCoW priorities, every change goes through the committee with an estimate of its impact on the deadline
Low adoption by usersambassadors in each department, training on their own cases, measuring usage from day one
Non-compliance with accessibility requirementsscreen reader testing in every sprint, components accessible by design, an expert audit before release

Measurable goals and KPIs

The values below are targets that we set with the client after a baseline measurement in the first phase.

KPITargetHow it is measured
Conversion on the key pathan increase over the baseline, target set after the baseline measurementproduct analytics, A/B tests
Active users of the solution≥ 80% of the target group after 3 monthsusage telemetry
Mobile app sessions without a crash≥ 99.8%crash reporting tool

Lessons learned and good practices

Making it easy to reschedule reduces no-shows more than penalties do. A shared customer database is a prerequisite for a loyalty program. Feature flags separate deployment from launch and drastically reduce release stress.

Why B2B.net

We combine two models: we supply individual specialists and whole teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.

Acceptance criteria

Each phase ends with a formal acceptance against criteria agreed at the start. In this implementation, acceptance covers: a journey map, backlog and prototype; ADRs, skeleton, CI/CD; an increment every sprint and demos; UAT, security and accessibility testing; go-live, hypercare, handover. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.

Next step

If you recognize these problems in your own organization, let's start with a short diagnosis: one workshop with your team and a written recommendation. Write to office@b2bnetwork.pl.

What would this look like for you?

Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.

Let's talk

B2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.