Project profitability analytics at a consulting firm

Project write-up

The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.

In brief

Problem
Project profitability is known only after projects end, because data on working time, costs and invoices sits in different systems.
Approach
We combine data from time tracking, the financial system and the CRM in a single project model.
Goal
Data freshness in reports: ≤ D+1 (or ≤ 15 min for operational data); share of records meeting quality rules: ≥ 98% in critical tables.

Client context

Service companies, from restaurant chains to consulting firms, grow faster than their IT back office. Their processes rely on e-mails and spreadsheets, which stop being enough with the next branch. A consulting firm with several business lines, billing projects on a fixed-price and time basis.

Challenge

Project profitability is known only after projects end, because data on working time, costs and invoices sits in different systems.

Requirements and constraints

  • GDPR, that is Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, data processing agreements and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
  • CSRD and ESRS: the sustainability reporting obligation requires data on emissions and energy use of a quality comparable to financial data, with a traceable source and the possibility of assurance. (source)
  • Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, every deliverable supplied with documentation that the client's team can take over.

Approach and architecture

We build the data platform in layers (raw, cleansed and business), with transformations in code, data quality tests and automatic lineage documentation. Every data product has an owner, a quality agreement (completeness, freshness, correctness) and a catalog where a business user finds the definition of a metric before asking an analyst.

We combine data from time tracking, the financial system and the CRM in a single project model. A dashboard shows current profitability, budget burn and an end-of-project forecast, with an alert when a threshold is exceeded.

Key elements of the solution:

  • A project model combining time, costs and revenue
  • An end-of-project profitability forecast
  • Budget overrun alerts
  • Dashboards for partners and managers

Team and roles

RoleCountResponsibility
Data engineer2pipelines, data model, data quality tests
BI analyst1dashboards, metric definitions, user training
Business analyst1requirements, processes, acceptance criteria
Product owner and domain experts (client side)as neededpriorities, business decisions, acceptance

Phased schedule

PhaseWeeksDeliverable
1. Inventory of sources and metrics1–3metric glossary, source map
2. Architecture and data model4–7layered model, standards
3. Building pipelines and quality tests8–14pipelines, tests, catalog
4. Reconciliation and parallel run15–18consistency reports
5. Rollout and training19–20dashboards, training, handover

Technology stack

PostgreSQL, dbt, Airbyte, Power BI.

Risks and how we mitigate them

RiskHow we mitigate it
No test data free of personal dataa synthetic data generator and masking that preserves referential integrity; a ban on copying production into tests
Diverging stakeholder expectationsa stakeholder map, a shared definition of success, a monthly steering committee
Errors in data migrationdata profiling, trial migrations with reconciliation, quality criteria before cutover

Measurable goals and KPIs

The values below are targets that we set with the client after a baseline measurement in the first phase.

KPITargetHow it is measured
Data freshness in reports≤ D+1 (or ≤ 15 min for operational data)pipeline metadata
Share of records meeting quality rules≥ 98% in critical tablesdata quality tests
Active users of the solution≥ 80% of the target group after 3 monthsusage telemetry

Lessons learned and good practices

An end-of-project forecast matters more than the current state. Project managers start using data when they see it every week, not once a quarter. A shared metric definition is worth more than the fastest query engine.

Why B2B.net

B2B.net S.A. has operated since 2015 and has worked for over 50 brands, mainly where audit is an everyday reality: in banks, insurance and critical infrastructure. We are an accredited exam center, so a testing methodology is not a claim for us but a working standard. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.

Acceptance criteria

Each phase ends with a formal acceptance against criteria agreed at the start. In this implementation, acceptance covers: a metric glossary and source map; a layered model and standards; pipelines, tests, catalog; consistency reports; dashboards, training, handover. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.

Next step

Facing a similar challenge? Write to office@b2bnetwork.pl or call +48 577 317 312. You get a first proposal of specialists or a plan for the first step within 24 hours.

What would this look like for you?

Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.

Let's talk