The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- The application path runs through several systems (scoring, credit bureau, income verification, contract signing) connected in batch mode.
- Approach
- We design the path from the customer's side: a prototype tested with users, then an application process orchestrator that calls the scoring, income verification (account data, with the customer's consent) and e-signature services.
- Goal
- Conversion on the key path: an increase over the baseline, target set after the baseline measurement; Lead time from change approval to production (DORA metrics): < 1 day.
Client context
In banking, the cost of a production defect is measured not only in complaints but also in customer trust and supervisory findings. Since January 17, 2025, DORA has applied, moving the conversation about IT quality from the IT department to the board. The client is a universal bank where an online loan application often ends with a call from an advisor and a branch visit, and application abandonment is high.
Challenge
The application path runs through several systems (scoring, credit bureau, income verification, contract signing) connected in batch mode. The customer waits hours for a decision, and every product change requires changes in several places.
Requirements and constraints
- Recommendation D of the KNF (Polish Financial Supervision Authority) sets out the supervisor's expectations for managing information technology and the security of the ICT environment in banks: separation of environments, change control, access management and business continuity. Every change in the system must go through a test and acceptance path that can be shown to an auditor. (source)
- PSD2 and the RTS on strong customer authentication (SCA) require strong customer authentication, secure interfaces for third-party providers (TPPs) and transaction monitoring for fraud. Every change to a payment path requires tests of SCA exemptions and of API availability compliance. (source)
- The European Accessibility Act (Directive 2019/882) and the Polish act on ensuring accessibility requirements have applied since June 28, 2025 to, among others, consumer banking, e-commerce and communications services. Digital channels must meet accessibility requirements, and failing to do so means a risk of fines and inspections by the market surveillance authority. (source)
- GDPR, Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, processing agreements and, for high-risk processing, an impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- The AI Act, Regulation (EU) 2024/1689, introduces obligations that depend on the risk category of the AI system: transparency toward users, human oversight, technical documentation and event logging. Systems that affect creditworthiness or employment may fall into the high-risk category. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, every deliverable handed over with documentation the client's team can take over.
Approach and architecture
The first weeks are discovery: mapping the user journey, prioritization (MoSCoW) and a clickable prototype tested with real users. Then development in Scrum with a demo every two weeks, continuous integration and deployments to the test environment after every merge. We record architectural decisions in an ADR log, so that years later it is clear why something was done one way and not another.
We design the path from the customer's side: a prototype tested with users, then an application process orchestrator that calls the scoring, income verification (account data, with the customer's consent) and e-signature services. Product parameters (amounts, terms, interest rates) are configuration, not code.
Key elements of the solution:
- Application frontend embedded in online and mobile banking
- Process orchestrator (Camunda) with persisted application state
- Integrations with the credit bureau, the scoring system and qualified signatures
- Product catalog as configuration
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Project manager | 1 | plan, budget, risks, communication with the steering committee |
| Business analyst | 1 | requirements, processes, acceptance criteria |
| UX/UI designer | 1 | research, prototypes, usability and accessibility testing |
| Frontend developer (React/Angular) | 2 | interface, accessibility, component tests |
| Backend developer (Java/Kotlin) | 3 | domain services, APIs, unit tests |
| Test analyst (ISTQB) | 2 | designing and executing cases, reporting defects |
| Test automation engineer | 1 | framework, scripts, CI integration |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Discovery and prototype | 1–5 | journey map, backlog, prototype |
| 2. Architecture and foundations | 6–10 | ADRs, skeleton, CI/CD |
| 3. Iterative development | 11–24 | increments every sprint, demos |
| 4. Stabilization and acceptance testing | 25–29 | UAT, security and accessibility testing |
| 5. Deployment and post-launch support | 30–32 | go-live, hypercare, handover |
Technology stack
React, TypeScript, Spring Boot, Camunda 8, PostgreSQL, Kafka, Playwright.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Scope creep during the project | backlog with MoSCoW priorities, every change goes through the committee with an assessment of the schedule impact |
| Dependence on an external provider and its deadlines | early agreement on API contracts, a stub environment, weekly dependency review |
| Non-compliance with accessibility requirements | screen reader testing in every sprint, components accessible by design, expert audit before release |
| Diverging stakeholder expectations | stakeholder map, a shared definition of success, monthly steering committee |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Conversion on the key path | an increase over the baseline, target set after the baseline measurement | product analytics, A/B tests |
| Lead time from change approval to production (DORA metrics) | < 1 day | repository and pipeline data |
| Critical defects found after deployment | 0 critical defects in the first 30 days | production incident register |
| WCAG 2.1 AA compliance | 0 critical errors in the audit | expert and automated audit |
Lessons learned and good practices
The biggest drop-offs come from questions the bank already knows the answer to, so the form has to be designed starting from the data the bank has. Product parameters as configuration can shorten the launch of new offers from months to weeks. Feature flags separate deployment from release and dramatically reduce release stress.
Why B2B.net
We combine two models: we provide individual engineers and whole teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies and experience with ISO 27001, DORA and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.
Next step
Want to see what such an implementation would look like in your organization? Book a 30-minute call. We will prepare a plan for the first six weeks and a team composition tailored to your system.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.