The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Production planning happens in spreadsheets, and the ERP is used mainly for bookkeeping.
- Approach
- We implement S/4HANA in the PP, MM, SD, and FI/CO modules with a fit-to-standard approach.
- Goal
- E2E processes covered by tests before go-live: 100% of critical processes; Reconciliation discrepancies between the old and new system: 0 unexplained discrepancies before cutover.
Client context
Industrial plants connect the IT world with the OT world: controllers, SCADA, and MES systems run for years, and every line stoppage costs money. Software changes must respect the rhythm of production. The client is a metal products manufacturer with one large plant, currently on an older ERP system with many auxiliary spreadsheets in production planning.
Challenge
Production planning happens in spreadsheets, and the ERP is used mainly for bookkeeping. The lack of reliable information on stock levels and work in progress causes excess inventory and delivery delays.
Requirements and constraints
- End of standard support for SAP ECC (2027): the vendor will end standard maintenance of the main SAP ECC 6.0 releases at the end of 2027. Migrating to S/4HANA requires a decision on the path (greenfield, brownfield, selective) and a very large volume of process regression tests. (source)
- KSeF (Poland's National e-Invoicing System) introduces mandatory structured invoices in the FA(3) format. Finance and accounting systems must handle sending, receiving, fallback modes, and KSeF numbers throughout the document flow. (source)
- NIS2, i.e. Directive (EU) 2022/2555, and the amendment to the Polish National Cybersecurity System Act (KSC) require essential and important entities to implement cybersecurity risk management measures, supply chain security, and incident reporting within short deadlines (an early warning within 24 hours). The management board is personally accountable, so documenting decisions is part of the product. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every element delivered with documentation that the client's team can take over.
Approach and architecture
We run SAP projects following SAP Activate: Prepare, Explore, Realize, Deploy, Run. In the Explore phase we compare processes with SAP's reference processes (fit-to-standard), and every deviation needs a business justification, because every custom development is a cost at the next upgrade. We build extensions outside the core (clean core, BTP) and automate end-to-end process regression tests.
We implement S/4HANA in the PP, MM, SD, and FI/CO modules with a fit-to-standard approach. We replace planning spreadsheets with MRP planning, using master data cleaned before migration. Production is recorded on terminals at the lines, not in the office at the end of the shift.
Key elements of the solution:
- PP/MM/SD/FI-CO configuration that follows the standard
- Cleaned master data: material numbers, routings, BOMs
- Production recording terminals
- Integration with the quality system and scales
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Project manager | 1 | plan, budget, risks, communication with the steering committee |
| SAP consultant (FI/CO, SD, MM, or PP module) | 4 | fit-to-standard, configuration, process testing |
| ABAP/BTP developer | 1 | extensions in the clean core model, integrations |
| Test analyst (ISTQB) | 2 | designing and running test cases, reporting defects |
| Business analyst | 1 | requirements, processes, acceptance criteria |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Prepare and Explore (fit-to-standard) | 1–9 | gap list, design decisions |
| 2. Realize: configuration and development | 10–24 | configuration, BTP extensions |
| 3. Data migration: trial runs | 25–31 | reconciliation reports |
| 4. Integration testing and UAT | 32–40 | E2E test protocols |
| 5. Deploy and hypercare | 41–44 | cutover, post-deployment support |
Technology stack
SAP S/4HANA, SAP Fiori, SAP BTP, SAP Cloud ALM, industrial terminals.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Errors in data migration | data profiling, trial migrations with reconciliation, quality criteria before cutover |
| Cutover risk | at least two dress rehearsals, a rollback plan with decision criteria, a maintenance window during low traffic |
| Low adoption by users | ambassadors in departments, training on their own cases, measuring usage from day one |
| Scope creep during the project | a backlog with MoSCoW priorities, every change goes through the committee with an estimate of its impact on the schedule |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| E2E processes covered by tests before go-live | 100% of critical processes | test catalog |
| Reconciliation discrepancies between the old and new system | 0 unexplained discrepancies before cutover | reconciliation report |
| Downtime during cutover | within the window agreed with the business | cutover plan |
| Active users of the solution | ≥ 80% of the target group after 3 months | usage telemetry |
Lessons learned and good practices
The quality of master data (routings, BOMs) decides whether MRP produces a reliable plan. Recording production at the line is a condition for real information on work in progress. Every deviation from the SAP standard is a cost at every future upgrade.
Why B2B.net
B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audit is an everyday matter: in banks, insurance, and critical infrastructure. We are an accredited exam center, so testing methodology is not a claim for us but a working standard. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.
Next step
Have a similar challenge? Write to office@b2bnetwork.pl or call: +48 577 317 312. You will get a first proposal of specialists or a plan for the first step within 24 hours.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.