The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- The production and office networks are connected in many places, suppliers have remote access to machines through various tools, and the network documentation is out of date.
- Approach
- First a passive inventory of OT assets (without active scanning, which could disrupt controllers), then a zones and conduits model per IEC 62443 and a segmentation plan rolled out in downtime windows.
- Goal
- Closed compliance gaps: 100% of critical gaps before the supervisory deadline; Time from detection to initial notification of a major incident: within the regulatory deadline (e.g. 4 h/24 h).
Client context
Industrial plants connect the IT world with the OT world: controllers, SCADA, and MES systems run for years, and every line stoppage costs money. Software changes must respect the rhythm of production. The client is a chemical plant that becomes an essential entity under the new regulations, with an OT network expanded over the years without formal segmentation.
Challenge
The production and office networks are connected in many places, suppliers have remote access to machines through various tools, and the network documentation is out of date. The management board is personally accountable for NIS2 compliance.
Requirements and constraints
- NIS2, i.e. Directive (EU) 2022/2555, and the amendment to the Polish National Cybersecurity System Act (KSC) require essential and important entities to implement cybersecurity risk management measures, supply chain security, and incident reporting within short deadlines (an early warning within 24 hours). The management board is personally accountable, so documenting decisions is part of the product. (source)
- The Polish National Cybersecurity System Act (KSC) defines the obligations of operators of essential services, including incident handling, cooperation with the CSIRT, and security audits every two years. The project must provide for an incident reporting procedure and audit trails. (source)
- IEC 62443 (security of industrial automation systems) divides an installation into zones and conduits, defines security levels (SL), and sets requirements for component suppliers. Every IT–OT connection must pass through a controlled conduit. (source)
- ISO/IEC 27001:2022 requires a documented information security management system: risk analysis, a statement of applicability, access control, and supplier management. Every element of the project must be traceable to a control from Annex A. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every element delivered with documentation that the client's team can take over.
Approach and architecture
We start with a gap analysis against the regulatory requirements and the standard, but the outcome is not just a report: it is a backlog of actions with owners, deadlines, and evidence criteria. We write the documentation (policies, procedures, registers) so that it matches what the organization really does, and we automate technical controls so that compliance evidence is produced continuously, not before every audit.
First a passive inventory of OT assets (without active scanning, which could disrupt controllers), then a zones and conduits model per IEC 62443 and a segmentation plan rolled out in downtime windows. Remote access for suppliers goes through a single controlled point with session recording.
Key elements of the solution:
- A passive inventory of OT assets
- A model of zones and conduits (IEC 62443)
- A single remote access point with MFA and recording
- An incident reporting procedure aligned with NIS2
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Security architect | 1 | threat model, security requirements, design reviews |
| Compliance specialist | 1 | requirements map, documentation, compliance evidence |
| Project manager | 1 | plan, budget, risks, communication with the steering committee |
| SOC analyst | 1 | detection rules, alert handling, playbooks |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Gap analysis and risk assessment | 1–4 | gap report, risk register |
| 2. Framework and documentation design | 5–8 | policies, procedures, registers |
| 3. Implementation of technical controls | 9–15 | controls, evidence automation |
| 4. Exercises and tests | 16–18 | incident exercises, resilience tests |
| 5. Internal audit and maintenance plan | 19–20 | audit report, compliance calendar |
Technology stack
Passive OT monitoring tools, industrial firewalls, a PAM solution, SIEM.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Impact of IT changes on production continuity (OT) | tests on a rig that replicates the line, changes only in downtime windows, zones and conduits per IEC 62443 |
| Unknown systems and accounts (shadow IT) | an inventory from tools and interviews, an asset register, central identity management |
| Diverging stakeholder expectations | a stakeholder map, a shared definition of success, a monthly steering committee |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Closed compliance gaps | 100% of critical gaps before the supervisory deadline | compliance backlog |
| Time from detection to initial notification of a major incident | within the regulatory deadline (e.g. 4 h/24 h) | exercises and incident register |
| Accounts with multi-factor authentication | 100% of accounts | identity console |
Lessons learned and good practices
A passive OT inventory is safe and usually reveals devices that nobody knew about. A single remote access point for suppliers is the fastest security improvement in a plant. Documentation that describes reality will survive an audit. Documentation written for the audit will not.
Why B2B.net
B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audit is an everyday matter: in banks, insurance, and critical infrastructure. We are an accredited exam center, so testing methodology is not a claim for us but a working standard. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.
Next step
Let's talk about your project. Within 24 hours we will get back to you with a quote or a proposal of engineers; a team can start within 5 business days. Contact: office@b2bnetwork.pl.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.