Skip to content
All projects

NIS2 program and OT network segmentation at a chemical plant

Project write-up

The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.

In brief

Problem
The production and office networks are connected in many places, suppliers have remote access to machines through various tools, and the network documentation is out of date.
Approach
First a passive inventory of OT assets (without active scanning, which could disrupt controllers), then a zones and conduits model per IEC 62443 and a segmentation plan rolled out in downtime windows.
Goal
Closed compliance gaps: 100% of critical gaps before the supervisory deadline; Time from detection to initial notification of a major incident: within the regulatory deadline (e.g. 4 h/24 h).

Client context

Industrial plants connect the IT world with the OT world: controllers, SCADA, and MES systems run for years, and every line stoppage costs money. Software changes must respect the rhythm of production. The client is a chemical plant that becomes an essential entity under the new regulations, with an OT network expanded over the years without formal segmentation.

Challenge

The production and office networks are connected in many places, suppliers have remote access to machines through various tools, and the network documentation is out of date. The management board is personally accountable for NIS2 compliance.

Requirements and constraints

  • NIS2, i.e. Directive (EU) 2022/2555, and the amendment to the Polish National Cybersecurity System Act (KSC) require essential and important entities to implement cybersecurity risk management measures, supply chain security, and incident reporting within short deadlines (an early warning within 24 hours). The management board is personally accountable, so documenting decisions is part of the product. (source)
  • The Polish National Cybersecurity System Act (KSC) defines the obligations of operators of essential services, including incident handling, cooperation with the CSIRT, and security audits every two years. The project must provide for an incident reporting procedure and audit trails. (source)
  • IEC 62443 (security of industrial automation systems) divides an installation into zones and conduits, defines security levels (SL), and sets requirements for component suppliers. Every IT–OT connection must pass through a controlled conduit. (source)
  • ISO/IEC 27001:2022 requires a documented information security management system: risk analysis, a statement of applicability, access control, and supplier management. Every element of the project must be traceable to a control from Annex A. (source)
  • Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every element delivered with documentation that the client's team can take over.

Approach and architecture

We start with a gap analysis against the regulatory requirements and the standard, but the outcome is not just a report: it is a backlog of actions with owners, deadlines, and evidence criteria. We write the documentation (policies, procedures, registers) so that it matches what the organization really does, and we automate technical controls so that compliance evidence is produced continuously, not before every audit.

First a passive inventory of OT assets (without active scanning, which could disrupt controllers), then a zones and conduits model per IEC 62443 and a segmentation plan rolled out in downtime windows. Remote access for suppliers goes through a single controlled point with session recording.

Key elements of the solution:

  • A passive inventory of OT assets
  • A model of zones and conduits (IEC 62443)
  • A single remote access point with MFA and recording
  • An incident reporting procedure aligned with NIS2

Team and roles

RoleCountResponsibility
Security architect1threat model, security requirements, design reviews
Compliance specialist1requirements map, documentation, compliance evidence
Project manager1plan, budget, risks, communication with the steering committee
SOC analyst1detection rules, alert handling, playbooks
Product owner and domain experts (client side)as neededpriorities, business decisions, acceptance

Phased schedule

PhaseWeeksDeliverable
1. Gap analysis and risk assessment1–4gap report, risk register
2. Framework and documentation design5–8policies, procedures, registers
3. Implementation of technical controls9–15controls, evidence automation
4. Exercises and tests16–18incident exercises, resilience tests
5. Internal audit and maintenance plan19–20audit report, compliance calendar

Technology stack

Passive OT monitoring tools, industrial firewalls, a PAM solution, SIEM.

Risks and how we mitigate them

RiskHow we mitigate it
Impact of IT changes on production continuity (OT)tests on a rig that replicates the line, changes only in downtime windows, zones and conduits per IEC 62443
Unknown systems and accounts (shadow IT)an inventory from tools and interviews, an asset register, central identity management
Diverging stakeholder expectationsa stakeholder map, a shared definition of success, a monthly steering committee

Measurable goals and KPIs

The values below are targets that we set with the client after a baseline measurement in the first phase.

KPITargetHow it is measured
Closed compliance gaps100% of critical gaps before the supervisory deadlinecompliance backlog
Time from detection to initial notification of a major incidentwithin the regulatory deadline (e.g. 4 h/24 h)exercises and incident register
Accounts with multi-factor authentication100% of accountsidentity console

Lessons learned and good practices

A passive OT inventory is safe and usually reveals devices that nobody knew about. A single remote access point for suppliers is the fastest security improvement in a plant. Documentation that describes reality will survive an audit. Documentation written for the audit will not.

Why B2B.net

B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audit is an everyday matter: in banks, insurance, and critical infrastructure. We are an accredited exam center, so testing methodology is not a claim for us but a working standard. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.

Next step

Let's talk about your project. Within 24 hours we will get back to you with a quote or a proposal of engineers; a team can start within 5 business days. Contact: office@b2bnetwork.pl.

What would this look like for you?

Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.

Let's talk

B2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.

More projects: Manufacturing