Controller software testing in line with ISO 26262 and ASPICE

Project write-up

The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.

In brief

Problem
The vehicle manufacturer requires evidence of ASPICE and ISO 26262 compliance, and the current tests lack full traceability to safety requirements.
Approach
A test process compliant with ASPICE (SWE.4–SWE.6): unit, integration, and qualification tests with traceability to requirements, HIL tests for safety functions, and reports for the client's audit.
Goal
Requirements with full traceability to tests: 100% of safety requirements; Defect detection effectiveness (DDE): ≥ 90%.

Client context

Software in and around the vehicle is growing faster than any other component. Functional safety and cybersecurity standards demand a discipline that cannot be added at the end of a project. This client is a supplier of electronic systems to vehicle manufacturers, developing software for a comfort and lighting controller.

Challenge

The vehicle manufacturer requires evidence of ASPICE and ISO 26262 compliance, and the current tests lack full traceability to safety requirements.

Requirements and constraints

  • ISO 26262 (functional safety of vehicles) requires ASIL classification, traceability of safety requirements to tests, and independent verification. All tools used in the verification chain must have a justified qualification. (source)
  • TISAX (VDA ISA) is the information security assessment required in the automotive supply chain. Access to prototype data requires a defined assessment level and physical and logical separation. (source)
  • UNECE WP.29 Regulations R155 and R156 require a cybersecurity management system (CSMS) and a software update management system (SUMS) for type-approved vehicles. Every OTA update must be tested, signed, and traceable to the vehicle version. (source)
  • Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation that the client's team can take over.

Approach and architecture

We work with an ISTQB-based test process: test basis analysis, test case design using black-box techniques (equivalence classes, boundary values, decision tables, state transitions), and then execution with full traceability to requirements. Test priority comes from product risk analysis, not from the order in the specification: we first check what hurts the client and the regulator when it stops working.

A test process compliant with ASPICE (SWE.4–SWE.6): unit, integration, and qualification tests with traceability to requirements, HIL tests for safety functions, and reports for the client's audit.

Key elements of the solution:

  • Traceability of safety requirements to tests
  • HIL tests of ASIL functions
  • Regression tests in nightly runs
  • Reports for the ASPICE audit

Team and roles

RoleCountResponsibility
Test manager (ISTQB Advanced)1test strategy, entry and exit criteria, quality reporting
Test analyst (ISTQB)2designing and executing test cases, reporting defects
Embedded software engineer (C/C++)2device software, HIL tests
Test automation engineer1framework, scripts, CI integration
Product owner and domain experts (client side)as neededpriorities, business decisions, acceptance

Phased schedule

PhaseWeeksDeliverable
1. Analysis and test strategy1–5test strategy, risk matrix, environment plan
2. Test case design6–12test case repository with traceability
3. System and integration testing13–25daily reports, defect register
4. Acceptance testing (UAT) with the business26–32UAT protocols, exit criteria
5. Closure report and handover33–36quality report, recommendations

Technology stack

dSPACE or Vector (CANoe), Polarion or codebeamer, Python, Jenkins.

Risks and how we mitigate them

RiskHow we mitigate it
Delays in delivery of hardware and devicessimulators and emulators in tests, earlier orders, HIL tests on prototypes
Auditor or regulator comments after go-livecompliance function involved from the analysis phase, evidence collected along the way, review before acceptance
Knowledge held by individual peoplepair programming, documentation in the repository, backup plan for key roles

Measurable goals and KPIs

The values below are targets that we agree with the client after a baseline measurement in the first phase.

KPITargetHow it is measured
Requirements with full traceability to tests100% of safety requirementsALM tool
Defect detection effectiveness (DDE)≥ 90%defects found in testing / all defects within 90 days
Critical defects found after go-live0 critical defects in the first 30 daysproduction incident register

Lessons learned and good practices

Traceability has to be built from the very first requirement, because an ASPICE audit checks it thoroughly. HIL benches are a bottleneck, so the schedule for using them is critical. Exit criteria agreed before testing starts save weeks of disputes at the end of the project.

Why B2B.net

B2B.net S.A. has been operating since 2015 and has worked for more than 50 brands, mainly where audits are an everyday reality: in banks, insurance, and critical infrastructure. We are an accredited exam center, so for us the testing methodology is not a claim but the standard way of working. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.

Acceptance criteria

Each phase ends with a formal acceptance against criteria agreed at the start. In this project, acceptance covers: test strategy, risk matrix, environment plan; test case repository with traceability; daily reports, defect register; UAT protocols, exit criteria; quality report, recommendations. Final acceptance requires a report of the KPI measurement against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with the cost and risk of each one assessed.

Next step

Let's talk about your project. Within 24 hours we will get back to you with a quote or a proposal of engineers; a team can start within 5 business days. Contact: office@b2bnetwork.pl.

What would this look like for you?

Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.

Let's talk

B2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.

More projects: Automotive