The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- The vehicle manufacturer requires evidence of ASPICE and ISO 26262 compliance, and the current tests lack full traceability to safety requirements.
- Approach
- A test process compliant with ASPICE (SWE.4–SWE.6): unit, integration, and qualification tests with traceability to requirements, HIL tests for safety functions, and reports for the client's audit.
- Goal
- Requirements with full traceability to tests: 100% of safety requirements; Defect detection effectiveness (DDE): ≥ 90%.
Client context
Software in and around the vehicle is growing faster than any other component. Functional safety and cybersecurity standards demand a discipline that cannot be added at the end of a project. This client is a supplier of electronic systems to vehicle manufacturers, developing software for a comfort and lighting controller.
Challenge
The vehicle manufacturer requires evidence of ASPICE and ISO 26262 compliance, and the current tests lack full traceability to safety requirements.
Requirements and constraints
- ISO 26262 (functional safety of vehicles) requires ASIL classification, traceability of safety requirements to tests, and independent verification. All tools used in the verification chain must have a justified qualification. (source)
- TISAX (VDA ISA) is the information security assessment required in the automotive supply chain. Access to prototype data requires a defined assessment level and physical and logical separation. (source)
- UNECE WP.29 Regulations R155 and R156 require a cybersecurity management system (CSMS) and a software update management system (SUMS) for type-approved vehicles. Every OTA update must be tested, signed, and traceable to the vehicle version. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation that the client's team can take over.
Approach and architecture
We work with an ISTQB-based test process: test basis analysis, test case design using black-box techniques (equivalence classes, boundary values, decision tables, state transitions), and then execution with full traceability to requirements. Test priority comes from product risk analysis, not from the order in the specification: we first check what hurts the client and the regulator when it stops working.
A test process compliant with ASPICE (SWE.4–SWE.6): unit, integration, and qualification tests with traceability to requirements, HIL tests for safety functions, and reports for the client's audit.
Key elements of the solution:
- Traceability of safety requirements to tests
- HIL tests of ASIL functions
- Regression tests in nightly runs
- Reports for the ASPICE audit
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Test manager (ISTQB Advanced) | 1 | test strategy, entry and exit criteria, quality reporting |
| Test analyst (ISTQB) | 2 | designing and executing test cases, reporting defects |
| Embedded software engineer (C/C++) | 2 | device software, HIL tests |
| Test automation engineer | 1 | framework, scripts, CI integration |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Analysis and test strategy | 1–5 | test strategy, risk matrix, environment plan |
| 2. Test case design | 6–12 | test case repository with traceability |
| 3. System and integration testing | 13–25 | daily reports, defect register |
| 4. Acceptance testing (UAT) with the business | 26–32 | UAT protocols, exit criteria |
| 5. Closure report and handover | 33–36 | quality report, recommendations |
Technology stack
dSPACE or Vector (CANoe), Polarion or codebeamer, Python, Jenkins.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Delays in delivery of hardware and devices | simulators and emulators in tests, earlier orders, HIL tests on prototypes |
| Auditor or regulator comments after go-live | compliance function involved from the analysis phase, evidence collected along the way, review before acceptance |
| Knowledge held by individual people | pair programming, documentation in the repository, backup plan for key roles |
Measurable goals and KPIs
The values below are targets that we agree with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Requirements with full traceability to tests | 100% of safety requirements | ALM tool |
| Defect detection effectiveness (DDE) | ≥ 90% | defects found in testing / all defects within 90 days |
| Critical defects found after go-live | 0 critical defects in the first 30 days | production incident register |
Lessons learned and good practices
Traceability has to be built from the very first requirement, because an ASPICE audit checks it thoroughly. HIL benches are a bottleneck, so the schedule for using them is critical. Exit criteria agreed before testing starts save weeks of disputes at the end of the project.
Why B2B.net
B2B.net S.A. has been operating since 2015 and has worked for more than 50 brands, mainly where audits are an everyday reality: in banks, insurance, and critical infrastructure. We are an accredited exam center, so for us the testing methodology is not a claim but the standard way of working. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.
Acceptance criteria
Each phase ends with a formal acceptance against criteria agreed at the start. In this project, acceptance covers: test strategy, risk matrix, environment plan; test case repository with traceability; daily reports, defect register; UAT protocols, exit criteria; quality report, recommendations. Final acceptance requires a report of the KPI measurement against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with the cost and risk of each one assessed.
Next step
Let's talk about your project. Within 24 hours we will get back to you with a quote or a proposal of engineers; a team can start within 5 business days. Contact: office@b2bnetwork.pl.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.