The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- The supplier has no formal threat analysis process (TARA), no product vulnerability management, and no TISAX assessment, which blocks new contracts.
- Approach
- We implement a TARA process per ISO/SAE 21434, product vulnerability management, and preparation for the TISAX assessment.
- Goal
- Closed compliance gaps: 100% of critical gaps before the supervisory deadline; Controls with automatically collected evidence: ≥ 60% of technical controls.
Client context
Software in and around the vehicle is growing faster than any other component. Functional safety and cybersecurity standards demand a discipline that cannot be added at the end of a project. This client is a supplier of electronic components whom vehicle manufacturers require to comply with R155 and to pass a TISAX assessment.
Challenge
The supplier has no formal threat analysis process (TARA), no product vulnerability management, and no TISAX assessment, which blocks new contracts.
Requirements and constraints
- UNECE WP.29 Regulations R155 and R156 require a cybersecurity management system (CSMS) and a software update management system (SUMS) for type-approved vehicles. Every OTA update must be tested, signed, and traceable to the vehicle version. (source)
- TISAX (VDA ISA) is the information security assessment required in the automotive supply chain. Access to prototype data requires a defined assessment level and physical and logical separation. (source)
- ISO 26262 (functional safety of vehicles) requires ASIL classification, traceability of safety requirements to tests, and independent verification. All tools used in the verification chain must have a justified qualification. (source)
- The Cyber Resilience Act (EU Regulation 2024/2847) imposes security obligations across the whole life cycle on manufacturers of products with digital elements: vulnerability management, SBOM, and reporting of actively exploited vulnerabilities. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation that the client's team can take over.
Approach and architecture
We start with a gap analysis against the regulatory requirements and the standard, but the result is not just a report: it is a backlog of actions with owners, deadlines, and evidence criteria. We write the documentation (policies, procedures, registers) so that it matches what the organization actually does, and we automate technical controls so that compliance evidence is produced continuously, not scrambled together before each audit.
We implement a TARA process per ISO/SAE 21434, product vulnerability management, and preparation for the TISAX assessment. The documentation is integrated with the development process rather than kept in a separate binder.
Key elements of the solution:
- TARA process (ISO/SAE 21434)
- Product vulnerability management and SBOM
- Preparation for the TISAX assessment
- Integration with the development process
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Security architect | 1 | threat model, security requirements, design reviews |
| Compliance specialist | 1 | requirements map, documentation, compliance evidence |
| Project manager | 1 | plan, budget, risks, communication with the steering committee |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Gap analysis and risk assessment | 1–4 | gap report, risk register |
| 2. Framework and documentation design | 5–8 | policies, procedures, registers |
| 3. Implementation of technical controls | 9–15 | controls, evidence automation |
| 4. Exercises and testing | 16–18 | incident exercises, resilience tests |
| 5. Internal audit and maintenance plan | 19–20 | audit report, compliance calendar |
Technology stack
TARA tools, Dependency-Track, Jira, documentation templates.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Auditor or regulator comments after go-live | compliance function involved from the analysis phase, evidence collected along the way, review before acceptance |
| Change or clarification of regulations during the project | monitoring of implementing acts, modular rule design, buffer in the schedule |
| Diverging stakeholder expectations | stakeholder map, shared definition of success, monthly steering committee |
Measurable goals and KPIs
The values below are targets that we agree with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Closed compliance gaps | 100% of critical gaps before the supervisory deadline | compliance backlog |
| Controls with automatically collected evidence | ≥ 60% of technical controls | controls register |
| Open critical and high vulnerabilities | 0 before release | vulnerability register |
Lessons learned and good practices
A TARA integrated with the development process stays current; separate documentation quickly goes stale. A TISAX assessment is an entry ticket to the supply chain, not a differentiator. Documentation that describes reality survives an audit, while documentation written for an audit does not.
Why B2B.net
B2B.net S.A. has been operating since 2015 and has worked for more than 50 brands, mainly where audits are an everyday reality: in banks, insurance, and critical infrastructure. We are an accredited exam center, so for us the testing methodology is not a claim but the standard way of working. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.
Acceptance criteria
Each phase ends with a formal acceptance against criteria agreed at the start. In this project, acceptance covers: gap report, risk register; policies, procedures, registers; controls, evidence automation; incident exercises, resilience tests; audit report, compliance calendar. Final acceptance requires a report of the KPI measurement against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with the cost and risk of each one assessed.
Next step
Facing a similar challenge? Write to office@b2bnetwork.pl or call: +48 577 317 312. You will get a first proposal of specialists or a plan for the first step within 24 hours.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.