The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- The launch of CSIRE changes the processes for switching suppliers, exchanging metering data, and billing.
- Approach
- A catalog of retail market processes (supplier switching, comprehensive contract, metering data, corrections) with risk assessment and end-to-end scenarios across billing, CRM, and the portal.
- Goal
- Defect detection effectiveness (DDE): ≥ 90%; Critical defects found after go-live: 0 critical defects in the first 30 days.
Client context
Energy companies are essential entities under NIS2 and the Polish National Cybersecurity System Act (KSC), and at the same time they must implement market changes imposed by national and EU regulations. The client is an electricity retailer serving individual and business customers, with a billing system, a CRM, and a customer portal.
Challenge
The launch of CSIRE changes the processes for switching suppliers, exchanging metering data, and billing. The systems must handle a new information exchange standard, and errors translate directly into customer invoices.
Requirements and constraints
- The Central Energy Market Information System (CSIRE) changes the model for exchanging metering data and retail energy market processes. Retailers and distribution system operators (OSD) must adapt their billing and customer service systems to the information exchange standard of the energy market information operator. (source)
- NIS2, that is Directive (EU) 2022/2555, and the amendment to the KSC Act require essential and important entities to implement cybersecurity risk management measures and supply chain security, and to report incidents within short deadlines (early warning within 24 hours). The management board is personally liable, so documenting decisions is part of the product. (source)
- GDPR, that is Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, and processing agreements, and for high-risk processing also a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- The Polish National Cybersecurity System Act defines the obligations of operators of essential services, including incident handling, cooperation with CSIRT, and security audits every two years. The project must provide for an incident reporting procedure and audit trails. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation that the client's team can take over.
Approach and architecture
We start with a risk-based test strategy: together with the process owners we assess the likelihood and impact of failure in each area, and the result determines how deep the testing goes. Test cases are designed by ISTQB-certified analysts, and every defect gets a root cause classification, so after a few sprints it is clear where most errors originate and what to improve in the development process.
A catalog of retail market processes (supplier switching, comprehensive contract, metering data, corrections) with risk assessment and end-to-end scenarios across billing, CRM, and the portal. Integration tests with a CSIRE message simulator and invoice comparison tests between the old and the new process.
Key elements of the solution:
- A catalog of retail market processes with risk ratings
- A simulator of messages compliant with the information exchange standard
- Invoice comparison between the old and new process
- A readiness report for the management board
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Test manager (ISTQB Advanced) | 1 | test strategy, entry and exit criteria, quality reporting |
| Test analyst (ISTQB) | 4 | designing and executing test cases, reporting defects |
| Business analyst | 2 | requirements, processes, acceptance criteria |
| Test automation engineer | 1 | framework, scripts, CI integration |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Analysis and test strategy | 1–5 | test strategy, risk matrix, environment plan |
| 2. Test case design | 6–11 | test case repository with traceability |
| 3. System and integration testing | 12–22 | daily reports, defect register |
| 4. Acceptance testing (UAT) with the business | 23–28 | UAT protocols, exit criteria |
| 5. Closure report and handover | 29–32 | quality report, recommendations |
Technology stack
Jira Xray, SQL, Postman, message simulator, Power BI.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Changes or clarifications to regulations during the project | monitoring of implementing acts, a modular rule design, a buffer in the schedule |
| Dependence on an external vendor and its deadlines | early agreement on API contracts, a stub environment, a weekly dependency review |
| Unavailable or unstable test environments | an environment booking schedule, virtualization of external services (mocks), a daily environment smoke test |
| Data migration errors | data profiling, trial migrations with reconciliation, quality criteria before cutover |
Measurable goals and KPIs
The values below are targets that we agree with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Defect detection effectiveness (DDE) | ≥ 90% | defects found in testing / all defects within 90 days |
| Critical defects found after go-live | 0 critical defects in the first 30 days | production incident register |
| Reconciliation discrepancies between old and new system | 0 unexplained discrepancies before cutover | reconciliation report |
Lessons learned and good practices
Comparing invoices from the old and new process is the simplest test that a management board understands. Regulatory changes during a project call for a modular test catalog. Traceability from requirements to tests is cheap when you build it from day one, and very expensive when you reconstruct it right before an audit.
Why B2B.net
We combine two models: we supply individual specialists and whole teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price per scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA, and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.
Next step
If you recognize these problems in your organization, let's start with a short diagnosis: one workshop with your team and a written recommendation. Write to us: office@b2bnetwork.pl.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.