The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Emissions data is estimated in spreadsheets.
- Approach
- An emissions model per shipment based on route, vehicle, and fuel consumption data, compliant with the ISO 14083 / GLEC methodology.
- Goal
- Share of records meeting quality rules: ≥ 98% in critical tables; Data freshness in reports: ≤ D+1 (or ≤ 15 min for operational data).
Client context
Logistics operators integrate with dozens of customers, carriers, and platforms, and the number of interfaces grows faster than the team that maintains them. This logistics operator has corporate customers who require transport emissions data for their own sustainability reports.
Challenge
Emissions data is estimated in spreadsheets. Customers expect data per shipment, compliant with a recognized methodology and verifiable.
Requirements and constraints
- CSRD and ESRS: the sustainability reporting obligation requires emissions and energy consumption data of a quality comparable to financial data, with a traceable source and the possibility of assurance. (source)
- GDPR, that is Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, data processing agreements, and, for high-risk processing, an impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation that the client's team can take over.
Approach and architecture
We start with the few key metrics that are disputed today and design the data model backwards from them. We run the migration from the existing data warehouse in parallel: during a transition period both systems calculate the same figures, and automated reconciliation comparisons show discrepancies before the board sees them.
An emissions model per shipment based on route, vehicle, and fuel consumption data, compliant with the ISO 14083 / GLEC methodology. The data is made available to customers in a portal and through an API, with lineage back to the source data.
Key elements of the solution:
- Emissions model per shipment (ISO 14083 / GLEC)
- Route, vehicle, and fuel data
- Portal and API for customers
- Lineage back to the source data
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Data engineer | 2 | pipelines, data model, data quality tests |
| BI analyst | 1 | dashboards, metric definitions, user training |
| Business analyst | 1 | requirements, processes, acceptance criteria |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Inventory of sources and metrics | 1–3 | metrics glossary, source map |
| 2. Architecture and data model | 4–7 | layered model, standards |
| 3. Building pipelines and quality tests | 8–14 | pipelines, tests, catalog |
| 4. Reconciliation and parallel run | 15–18 | compliance reports |
| 5. Rollout and training | 19–20 | dashboards, training, handover |
Technology stack
PostgreSQL, dbt, Airflow, Power BI, REST API.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| No test data free of personal data | synthetic data generator and masking that preserves referential integrity; no copying of production into tests |
| Auditor or regulator comments after go-live | compliance function involved from the analysis phase, evidence collected along the way, review before acceptance |
| Change or clarification of regulations during the project | monitoring of implementing acts, modular rule design, buffer in the schedule |
Measurable goals and KPIs
The values below are targets that we agree with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Share of records meeting quality rules | ≥ 98% in critical tables | data quality tests |
| Data freshness in reports | ≤ D+1 (or ≤ 15 min for operational data) | pipeline metadata |
| Time to prepare a regulatory or management report | reduced from days to hours | before/after measurement |
Lessons learned and good practices
A recognized methodology (ISO 14083) is a precondition for customers to use the data in their reports. Data lineage is essential for assurance. Data quality tests must block publication, otherwise nobody reads them.
Why B2B.net
We combine two models: we supply individual specialists and entire teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA, and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.
Acceptance criteria
Each phase ends with a formal acceptance against criteria agreed at the start. In this project, acceptance covers: metrics glossary, source map; layered model, standards; pipelines, tests, catalog; compliance reports; dashboards, training, handover. Final acceptance requires a report of the KPI measurement against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with the cost and risk of each one assessed.
Next step
Want to check what such a deployment would look like in your organization? Book a 30-minute call. We will prepare a plan for the first six weeks and a team composition matched to your system.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.