The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- The integration between the WMS and warehouse automation is only tested on site, once the installation is ready.
- Approach
- Warehouse automation emulators let us test the flows (receiving, storage, picking, shipping) before the installation is mounted.
- Goal
- Full regression time: from days to hours, target ≤ 8 h; Share of automated regression cases: ≥ 70% of critical paths.
Client context
Logistics operators integrate with dozens of customers, carriers, and platforms, and the number of interfaces grows faster than the team that maintains them. This logistics operator is opening a new warehouse with automation (sorters, conveyors) integrated with a WMS.
Challenge
The integration between the WMS and warehouse automation is only tested on site, once the installation is ready. Testing delays push back the opening date.
Requirements and constraints
- NIS2, that is Directive (EU) 2022/2555, and the amendment to the Polish National Cybersecurity System Act (KSC) require essential and important entities to implement cybersecurity risk management measures, supply chain security, and incident reporting within short deadlines (an early warning within 24 hours). Management is personally accountable, so documenting decisions is part of the product. (source)
- IEC 62443 (security of industrial automation systems) divides an installation into zones and conduits, defines security levels (SL), and sets requirements for component suppliers. Every IT–OT connection must go through a controlled conduit. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation that the client's team can take over.
Approach and architecture
Instead of automating everything in manual regression, we select cases using a simple calculation: execution frequency, feature stability, maintenance cost, and risk. Tests are data-independent (each one prepares and cleans up its own data), carry tags that let us run smoke, regression, and nightly suites, and unstable tests go into quarantine instead of blocking releases.
Warehouse automation emulators let us test the flows (receiving, storage, picking, shipping) before the installation is mounted. We automate the end-to-end tests, and on site we only run confirmation tests.
Key elements of the solution:
- Sorter and conveyor emulators
- Automated tests of warehouse flows
- Exception handling tests (jams, missing label)
- Confirmation tests on the installation
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| QA lead | 1 | organizing the testers' work, test case reviews, defect metrics |
| Test automation engineer | 2 | framework, scripts, CI integration |
| Test analyst (ISTQB) | 1 | designing and executing test cases, reporting defects |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Regression audit and selection of candidates | 1–2 | automation map, cost-benefit calculation |
| 2. Framework build and CI integration | 3–6 | framework, pipeline, test code standard |
| 3. Automation of critical paths | 7–13 | smoke and regression suites |
| 4. Stabilization and reporting | 14–17 | quality dashboard, quarantine for unstable tests |
| 5. Handover and team training | 18–20 | documentation, workshops, maintenance plan |
Technology stack
Python, pytest, automation emulators, SQL, Jenkins.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Delays in delivery of hardware and devices | simulators and emulators in tests, earlier orders, HIL tests on prototypes |
| Test environments unavailable or unstable | environment booking schedule, virtualization of external services (mocks), daily environment smoke test |
| Impact of IT changes on production continuity (OT) | tests on a rig that reproduces the line, changes only in downtime windows, zones and conduits per IEC 62443 |
Measurable goals and KPIs
The values below are targets that we agree with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Full regression time | from days to hours, target ≤ 8 h | suite execution time in CI |
| Share of automated regression cases | ≥ 70% of critical paths | test repository |
| Critical defects found after go-live | 0 critical defects in the first 30 days | production incident register |
Lessons learned and good practices
Automation emulators save the most time, because they move testing ahead of the installation date. Exception handling decides whether the warehouse copes with peak load. Automation pays off when it runs on every change, not once before a release.
Why B2B.net
We combine two models: we supply individual specialists and entire teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA, and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.
Acceptance criteria
Each phase ends with a formal acceptance against criteria agreed at the start. In this project, acceptance covers: automation map, cost-benefit calculation; framework, pipeline, test code standard; smoke and regression suites; quality dashboard, quarantine for unstable tests; documentation, workshops, maintenance plan. Final acceptance requires a report of the KPI measurement against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with the cost and risk of each one assessed.
Next step
If you recognize these problems in your organization, let's start with a short diagnosis: one workshop with your team and written recommendations. Write to us at office@b2bnetwork.pl.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.