Integrating a lending platform with open banking for income verification

Project write-up

The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.

In brief

Problem
PDF statements are easy to forge and hard to analyze.
Approach
We integrate the application process with an account information service (AIS) through a licensed provider, with the customer's consent.
Goal
Conversion on the key path: an increase over the starting point, target set after the baseline measurement; API p99 latency: ≤ 300 ms.

Client context

Non-bank financial institutions (leasing, factoring, investment fund companies, brokerage houses, payment institutions) compete on the speed of decisions and service, while their reporting obligations keep growing. The client is a non-bank lender that issues loans online, with income verification based on statements uploaded by customers.

Challenge

PDF statements are easy to forge and hard to analyze. Customers abandon the application when they have to find and upload documents.

Requirements and constraints

  • PSD2 and the RTS on strong customer authentication (SCA) require strong customer authentication, secure interfaces for third-party providers (TPP), and transaction monitoring for fraud. Every change to the payment path requires tests of SCA exemptions and of API availability compliance. (source)
  • GDPR, i.e. Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, processing agreements, and, for high-risk processing, an impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
  • The Polish Anti-Money Laundering Act (AML) requires financial security measures, transaction monitoring, and reporting to the GIIF (Polish Financial Intelligence Unit). Scoring rules and models must be explainable and versioned, and every threshold change must be documented. (source)
  • The AI Act, i.e. Regulation (EU) 2024/1689, introduces obligations that depend on the risk category of the AI system: transparency toward users, human oversight, technical documentation, and event logging. Systems that affect creditworthiness or employment may fall into the high-risk category. (source)
  • Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every element delivered with documentation that the client's team can take over.

Approach and architecture

We design integrations starting from the contract: an OpenAPI or AsyncAPI specification is written and agreed with consumers before anyone writes code. We base asynchronous communication on events with a schema registry and compatibility rules, and the transactional outbox pattern and idempotent consumers protect against duplicates and lost messages. Every integration has an owner, metrics, and alerts.

We integrate the application process with an account information service (AIS) through a licensed provider, with the customer's consent. Data on income and spending is categorized and feeds the creditworthiness assessment. PDF statements remain as a fallback path.

Key elements of the solution:

  • Integration with the AIS provider through its API
  • Management of customer consents and their expiry
  • Transaction categorization
  • A fallback path with documents

Team and roles

RoleCountResponsibility
Integration engineer2API contracts, Kafka, ESB, contract tests
Backend developer (Java/Kotlin)2domain services, API, unit tests
Test analyst (ISTQB)1designing and running test cases, reporting defects
Business analyst1requirements, processes, acceptance criteria
Product owner and domain experts (client side)as neededpriorities, business decisions, acceptance

Phased schedule

PhaseWeeksDeliverable
1. Integration inventory1–3flow map, interface catalog
2. Contract and platform design4–7API specifications, schema registry
3. Build and incremental migration8–15new interfaces, traffic cutovers
4. Contract and resilience tests16–18contract tests, failure scenarios
5. Decommissioning old connections19–20shutdown plan, documentation

Technology stack

Node.js or Java, PostgreSQL, Kafka, the AIS provider's API, Postman.

Risks and how we mitigate them

RiskHow we mitigate it
Dependence on an external vendor and its deadlinesearly agreement on API contracts, a stub environment, a weekly review of dependencies
Processing of especially sensitive dataa DPIA before the start, pseudonymization, role-based access, logging of reads
Scope creep during the projecta backlog with MoSCoW priorities, every change goes through the committee with an estimate of its impact on the schedule

Measurable goals and KPIs

The values below are targets that we set with the client after a baseline measurement in the first phase.

KPITargetHow it is measured
Conversion on the key pathan increase over the starting point, target set after the baseline measurementproduct analytics, A/B tests
API p99 latency≤ 300 msAPM
Critical defects found after deployment0 critical defects in the first 30 daysproduction incident log

Lessons learned and good practices

The customer's consent must be understandable and limited to what is needed. That is a condition of both GDPR compliance and conversion. A fallback path is necessary, because not every customer will agree to account access. The most expensive integrations are the ones nobody has inventoried.

Why B2B.net

B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audit is an everyday matter: in banks, insurance, and critical infrastructure. We are an accredited exam center, so testing methodology is not a claim for us but a working standard. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.

Acceptance criteria

Every phase ends with a formal acceptance against criteria agreed at the start. In this deployment, acceptance covers: flow map, interface catalog; API specifications, schema registry; new interfaces, traffic cutovers; contract tests, failure scenarios; shutdown plan, documentation. Final acceptance requires a KPI measurement report against the starting point, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with an estimate of the cost and risk of each.

Next step

Let's talk about your project. Within 24 hours we will get back to you with a quote or a proposal of engineers; a team can start within 5 business days. Contact: office@b2bnetwork.pl.

What would this look like for you?

Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.

Let's talk

B2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.

More projects: Finance