Cloud platform and DevOps for a payments fintech

Project write-up

The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.

In brief

Problem
The infrastructure was built by hand, deployments are rare and stressful, and cloud costs are growing faster than revenue.
Approach
We rewrite the infrastructure as code, build a pipeline with canary deployments and automatic rollback, and add observability with SLOs for key payment operations.
Goal
Deployment frequency: on demand, at least weekly; Share of deployments causing an incident (change failure rate): < 15%.

Client context

Financial firms work under pressure on decision time: the customer expects an answer in minutes, while the regulator requires a full trail of how that decision was made. The client is a fintech building payment services for e-commerce, with growing traffic and ambitions to expand abroad.

Challenge

The infrastructure was built by hand, deployments are rare and stressful, and cloud costs are growing faster than revenue. Banking partners are asking questions about resilience and DORA compliance.

Requirements and constraints

  • DORA, i.e. Regulation (EU) 2022/2554, enforces ICT risk management, a register of contracts with ICT providers, classification and reporting of major incidents, and regular testing of operational resilience. For the project this means that every new component must have an owner, a dependency map, and a resilience test scenario, and the provider (including us) is entered in the register of information on contractual arrangements. (source)
  • PCI DSS v4.0 applies to everyone who processes payment card data. Version 4.0 tightens requirements for multi-factor authentication, scripts on payment pages, and penetration tests of segmentation. (source)
  • GDPR, i.e. Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, processing agreements, and, for high-risk processing, an impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
  • Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every element delivered with documentation that the client's team can take over.

Approach and architecture

We build an internal developer platform: product teams get ready-made service templates, a pipeline, and observability, instead of configuring everything from scratch. Deployments follow the GitOps model with the ability to roll back instantly, and cloud costs are tagged to teams and shown every week (FinOps).

We rewrite the infrastructure as code, build a pipeline with canary deployments and automatic rollback, and add observability with SLOs for key payment operations. Costs are tagged per service and reviewed every week.

Key elements of the solution:

  • Infrastructure as code (Terraform)
  • Kubernetes with canary deployments (Argo Rollouts)
  • SLOs and error budgets for payments
  • FinOps: tagging and weekly reports

Team and roles

RoleCountResponsibility
Cloud architect1landing zone, network, cloud security, costs
DevOps engineer2CI/CD pipeline, infrastructure as code
SRE engineer1observability, SLOs, incident procedures
Product owner and domain experts (client side)as neededpriorities, business decisions, acceptance

Phased schedule

PhaseWeeksDeliverable
1. Readiness assessment and migration plan1–4inventory, 6R paths, business case
2. Landing zone and security5–9accounts/subscriptions, network, IAM, policies
3. Migration in waves10–19migrated applications, runbooks
4. Optimization and FinOps20–23right-sizing, cost report
5. Operations handover24–24documentation, on-call, training

Technology stack

AWS, EKS, Terraform, Argo CD, Argo Rollouts, Prometheus, Grafana, OpenTelemetry.

Risks and how we mitigate them

RiskHow we mitigate it
Uncontrolled growth of cloud costsbudgets and alerts, tagging, a weekly FinOps review, reservations once the workload has stabilized
Service downtime during changesblue-green or canary deployments, feature flags, maintenance windows agreed with the business
Knowledge held in the heads of individualspair programming, documentation in the repository, a backup plan for key roles

Measurable goals and KPIs

The values below are targets that we set with the client after a baseline measurement in the first phase.

KPITargetHow it is measured
Deployment frequencyon demand, at least weeklyCD pipeline
Share of deployments causing an incident (change failure rate)< 15%change and incident register
Service restoration time< 1 h for P1 incidentsticketing system
Infrastructure cost per transaction or usera decrease compared to the starting point, target set after phase 1FinOps report

Lessons learned and good practices

SLOs defined for business operations are easier for banking partners to understand than server metrics. Canary deployments change the culture: small changes stop being a risk. Cloud costs have to be shown to teams from the first week, not after the first invoice.

Why B2B.net

We combine two models: we provide individual specialists and whole teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the result, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA, and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.

Acceptance criteria

Every phase ends with a formal acceptance against criteria agreed at the start. In this deployment, acceptance covers: inventory, 6R paths, business case; accounts/subscriptions, network, IAM, policies; migrated applications, runbooks; right-sizing, cost report; documentation, on-call, training. Final acceptance requires a KPI measurement report against the starting point, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with an estimate of the cost and risk of each.

Next step

Want to see how such an implementation would look in your organization? Book a 30-minute call. We will prepare a plan for the first six weeks and a team composition matched to your system.

What would this look like for you?

Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.