The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- The infrastructure was built by hand, deployments are rare and stressful, and cloud costs are growing faster than revenue.
- Approach
- We rewrite the infrastructure as code, build a pipeline with canary deployments and automatic rollback, and add observability with SLOs for key payment operations.
- Goal
- Deployment frequency: on demand, at least weekly; Share of deployments causing an incident (change failure rate): < 15%.
Client context
Financial firms work under pressure on decision time: the customer expects an answer in minutes, while the regulator requires a full trail of how that decision was made. The client is a fintech building payment services for e-commerce, with growing traffic and ambitions to expand abroad.
Challenge
The infrastructure was built by hand, deployments are rare and stressful, and cloud costs are growing faster than revenue. Banking partners are asking questions about resilience and DORA compliance.
Requirements and constraints
- DORA, i.e. Regulation (EU) 2022/2554, enforces ICT risk management, a register of contracts with ICT providers, classification and reporting of major incidents, and regular testing of operational resilience. For the project this means that every new component must have an owner, a dependency map, and a resilience test scenario, and the provider (including us) is entered in the register of information on contractual arrangements. (source)
- PCI DSS v4.0 applies to everyone who processes payment card data. Version 4.0 tightens requirements for multi-factor authentication, scripts on payment pages, and penetration tests of segmentation. (source)
- GDPR, i.e. Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, processing agreements, and, for high-risk processing, an impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every element delivered with documentation that the client's team can take over.
Approach and architecture
We build an internal developer platform: product teams get ready-made service templates, a pipeline, and observability, instead of configuring everything from scratch. Deployments follow the GitOps model with the ability to roll back instantly, and cloud costs are tagged to teams and shown every week (FinOps).
We rewrite the infrastructure as code, build a pipeline with canary deployments and automatic rollback, and add observability with SLOs for key payment operations. Costs are tagged per service and reviewed every week.
Key elements of the solution:
- Infrastructure as code (Terraform)
- Kubernetes with canary deployments (Argo Rollouts)
- SLOs and error budgets for payments
- FinOps: tagging and weekly reports
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Cloud architect | 1 | landing zone, network, cloud security, costs |
| DevOps engineer | 2 | CI/CD pipeline, infrastructure as code |
| SRE engineer | 1 | observability, SLOs, incident procedures |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Readiness assessment and migration plan | 1–4 | inventory, 6R paths, business case |
| 2. Landing zone and security | 5–9 | accounts/subscriptions, network, IAM, policies |
| 3. Migration in waves | 10–19 | migrated applications, runbooks |
| 4. Optimization and FinOps | 20–23 | right-sizing, cost report |
| 5. Operations handover | 24–24 | documentation, on-call, training |
Technology stack
AWS, EKS, Terraform, Argo CD, Argo Rollouts, Prometheus, Grafana, OpenTelemetry.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Uncontrolled growth of cloud costs | budgets and alerts, tagging, a weekly FinOps review, reservations once the workload has stabilized |
| Service downtime during changes | blue-green or canary deployments, feature flags, maintenance windows agreed with the business |
| Knowledge held in the heads of individuals | pair programming, documentation in the repository, a backup plan for key roles |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Deployment frequency | on demand, at least weekly | CD pipeline |
| Share of deployments causing an incident (change failure rate) | < 15% | change and incident register |
| Service restoration time | < 1 h for P1 incidents | ticketing system |
| Infrastructure cost per transaction or user | a decrease compared to the starting point, target set after phase 1 | FinOps report |
Lessons learned and good practices
SLOs defined for business operations are easier for banking partners to understand than server metrics. Canary deployments change the culture: small changes stop being a risk. Cloud costs have to be shown to teams from the first week, not after the first invoice.
Why B2B.net
We combine two models: we provide individual specialists and whole teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the result, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA, and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.
Acceptance criteria
Every phase ends with a formal acceptance against criteria agreed at the start. In this deployment, acceptance covers: inventory, 6R paths, business case; accounts/subscriptions, network, IAM, policies; migrated applications, runbooks; right-sizing, cost report; documentation, on-call, training. Final acceptance requires a KPI measurement report against the starting point, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with an estimate of the cost and risk of each.
Next step
Want to see how such an implementation would look in your organization? Book a 30-minute call. We will prepare a plan for the first six weeks and a team composition matched to your system.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.