The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Every release can break the configuration of one of the clients, and manual tests cover only the default configuration.
- Approach
- Tests run against a set of representative (anonymized) client configurations, and the pipeline blocks a release when any of them regresses.
- Goal
- Full regression time: from days to hours, target ≤ 8 h; share of deployments causing an incident (change failure rate): < 15%.
Client context
Technology companies and software houses sell the quality of their own software, so their development processes are their showcase. The growing demands of enterprise clients (audits, SBOMs, security testing) pass down the supply chain. A SaaS vendor for HR departments, with many corporate clients and per-client configuration.
Challenge
Every release can break the configuration of one of the clients, and manual tests cover only the default configuration. Corporate clients require information about testing before an update.
Requirements and constraints
- GDPR, that is Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, data processing agreements and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- ISO/IEC 27001:2022 requires a documented information security management system: risk analysis, a statement of applicability, access control and supplier management. Every element of the project must be traceable to a control in Annex A. (source)
- The Polish Labor Code and GDPR in HR processes limit the scope of data an employer may process about candidates and employees, and hiring decisions cannot rest solely on automated processing (Article 22 GDPR). (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, every deliverable supplied with documentation that the client's team can take over.
Approach and architecture
We build automation according to the test pyramid: the most tests at the unit and API level, fewer at the interface level, and end-to-end scenarios only for critical business paths. The framework is built as a product (with code reviews, versioning and documentation) and from the first sprint runs in the CI pipeline, so the development team gets feedback in minutes rather than after a week.
Tests run against a set of representative (anonymized) client configurations, and the pipeline blocks a release when any of them regresses. A test report for clients is generated automatically with every release.
Key elements of the solution:
- A set of representative client configurations
- API and UI tests across a configuration matrix
- A release gate in the pipeline
- An automatic test report for clients
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| QA lead | 1 | organizing testers' work, reviewing cases, defect metrics |
| Test automation engineer | 3 | framework, scripts, CI integration |
| DevOps engineer | 1 | CI/CD pipeline, infrastructure as code |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Regression audit and candidate selection | 1–2 | automation map, cost-benefit analysis |
| 2. Framework build and CI integration | 3–6 | framework, pipeline, test code standard |
| 3. Automation of critical paths | 7–13 | smoke and regression suites |
| 4. Stabilization and reporting | 14–17 | quality dashboard, quarantine of flaky tests |
| 5. Handover and team training | 18–20 | documentation, workshops, maintenance plan |
Technology stack
Playwright, TypeScript, Cypress, GitHub Actions, Docker.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Flaky automated tests | test quarantine, root cause analysis, stable selectors and independent data |
| No test data free of personal data | a synthetic data generator and masking that preserves referential integrity; a ban on copying production into tests |
| Unavailable or unstable test environments | an environment booking schedule, virtualization of external services (mocks), a daily environment smoke test |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Full regression time | from days to hours, target ≤ 8 h | suite execution time in CI |
| Share of deployments causing an incident (change failure rate) | < 15% | change and incident register |
| Share of flaky tests | < 2% | pipeline report (tests with varying results) |
Lessons learned and good practices
In SaaS, testing the configuration matrix matters more than code coverage. An automatic test report builds the trust of corporate clients. A flaky test is worse than no test, because it undermines trust in the whole suite.
Why B2B.net
B2B.net S.A. has operated since 2015 and has worked for over 50 brands, mainly where audit is an everyday reality: in banks, insurance and critical infrastructure. We are an accredited exam center, so a testing methodology is not a claim for us but a working standard. We give a first proposal of specialists within 24 hours, and a team can start within 5 business days.
Acceptance criteria
Each phase ends with a formal acceptance against criteria agreed at the start. In this implementation, acceptance covers: an automation map and cost-benefit analysis; a framework, pipeline and test code standard; smoke and regression suites; a quality dashboard and quarantine of flaky tests; documentation, workshops and a maintenance plan. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.
Next step
Facing a similar challenge? Write to office@b2bnetwork.pl or call +48 577 317 312. You get a first proposal of specialists or a plan for the first step within 24 hours.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.