The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Clients expect a SaaS model, but the product is not prepared for multi-tenancy.
- Approach
- We choose an isolation model (separate databases per client, a shared application layer), containerize the application and build automatic provisioning of a client environment.
- Goal
- Deployment frequency: on demand, at least weekly; infrastructure cost per transaction or user: a decrease against the baseline, target set after phase 1.
Client context
B2B software vendors increasingly hear questions about DORA, NIS2 and the Cyber Resilience Act from their regulated clients. They must answer with evidence, not declarations. An ERP software vendor for mid-sized companies, which has so far sold licenses installed at clients' sites.
Challenge
Clients expect a SaaS model, but the product is not prepared for multi-tenancy. Every installation at a client is different, which makes updates harder.
Requirements and constraints
- GDPR, that is Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, data processing agreements and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- ISO/IEC 27001:2022 requires a documented information security management system: risk analysis, a statement of applicability, access control and supplier management. Every element of the project must be traceable to a control in Annex A. (source)
- KSeF (Poland's National e-Invoicing System) introduces mandatory structured invoices in the FA(3) format. Financial and accounting systems must handle sending, receiving, fallback modes and KSeF numbers across the whole document flow. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, every deliverable supplied with documentation that the client's team can take over.
Approach and architecture
We build an internal developer platform: the product team gets ready-made service templates, a pipeline and observability instead of configuring everything from scratch. Deployments follow a GitOps model with the ability to roll back instantly, and cloud costs are tagged to teams and shown every week (FinOps).
We choose an isolation model (separate databases per client, a shared application layer), containerize the application and build automatic provisioning of a client environment. Clients are migrated in waves with a data transfer tool.
Key elements of the solution:
- Application containerization
- A per-client data isolation model
- Automatic provisioning of client environments
- A tool for migrating data from on-premise installations
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Cloud architect | 1 | landing zone, network, cloud security, costs |
| DevOps engineer | 2 | CI/CD pipeline, infrastructure as code |
| Backend developer (Java/Kotlin) | 2 | domain services, API, unit tests |
| Test analyst (ISTQB) | 1 | designing and executing test cases, reporting defects |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Readiness assessment and migration plan | 1–3 | inventory, 6R paths, business case |
| 2. Landing zone and security | 4–7 | accounts/subscriptions, network, IAM, policies |
| 3. Migration in waves | 8–15 | migrated applications, runbooks |
| 4. Optimization and FinOps | 16–18 | right-sizing, cost report |
| 5. Operations handover | 19–20 | documentation, on-call, training |
Technology stack
Azure, AKS, Terraform, Azure SQL, Helm, GitHub Actions.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Errors in data migration | data profiling, trial migrations with reconciliation, quality criteria before cutover |
| Uncontrolled growth of cloud costs | budgets and alerts, tagging, a weekly FinOps review, reservations once the load has stabilized |
| Undocumented behavior of the old system | characterization tests (golden master) before the change, old/new result comparisons |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Deployment frequency | on demand, at least weekly | CD pipeline |
| Infrastructure cost per transaction or user | a decrease against the baseline, target set after phase 1 | FinOps report |
| Service availability | ≥ 99.9% per month | synthetic monitoring, SLOs |
Lessons learned and good practices
Choosing the data isolation model is a business decision, not only a technical one, because it affects costs and sales. Automatic provisioning of a client environment is a prerequisite for scaling SaaS. Cloud costs have to be shown to teams from the first week, not after the first invoice.
Why B2B.net
We combine two models: we supply individual specialists and whole teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price for a defined scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.
Acceptance criteria
Each phase ends with a formal acceptance against criteria agreed at the start. In this implementation, acceptance covers: an inventory, 6R paths and a business case; accounts/subscriptions, network, IAM and policies; migrated applications and runbooks; right-sizing and a cost report; documentation, on-call and training. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.
Next step
If you recognize these problems in your own organization, let's start with a short diagnosis: one workshop with your team and a written recommendation. Write to office@b2bnetwork.pl.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.