The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Prosumers do not understand net-billing settlements and call the helpline.
- Approach
- The app shows production, consumption, the prosumer deposit balance, and recommendations (when to charge the storage, when to run appliances).
- Goal
- Active users of the solution: ≥ 80% of the target group after 3 months; Sessions without a mobile app crash: ≥ 99.8%.
Client context
Energy companies are essential entities under NIS2 and the Polish National Cybersecurity System Act (KSC), and at the same time they must implement market changes imposed by national and EU regulations. The client is an energy retailer offering customers photovoltaic installations, energy storage, and heat pumps, with net-billing settlements.
Challenge
Prosumers do not understand net-billing settlements and call the helpline. Data from inverters and meters sits in different systems.
Requirements and constraints
- GDPR, that is Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, and processing agreements, and for high-risk processing also a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- The European Accessibility Act (Directive 2019/882) and the Polish act on ensuring compliance with accessibility requirements have covered, since June 28, 2025, consumer banking, e-commerce, and communications services, among others. Digital channels must meet accessibility requirements, and failing to do so risks fines and inspections by the market surveillance authority. (source)
- The Central Energy Market Information System (CSIRE) changes the model for exchanging metering data and retail energy market processes. Retailers and distribution system operators (OSD) must adapt their billing and customer service systems to the information exchange standard of the energy market information operator. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation that the client's team can take over.
Approach and architecture
The first weeks are discovery: mapping the user journey, prioritization (MoSCoW), and a clickable prototype tested with real users. Then we develop in Scrum with a demo every two weeks, continuous integration, and a deployment to the test environment after every merge. We record architectural decisions in an ADR register, so that years later it is clear why something was done one way and not another.
The app shows production, consumption, the prosumer deposit balance, and recommendations (when to charge the storage, when to run appliances). Inverter data is pulled through the manufacturers' APIs, and settlements come from billing.
Key elements of the solution:
- Integrations with inverter manufacturers' APIs
- A net-billing settlement model
- Consumption recommendations based on hourly prices
- A mobile and web app
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Project manager | 1 | plan, budget, risks, communication with the steering committee |
| UX/UI designer | 1 | research, prototypes, usability and accessibility testing |
| Mobile developer (Kotlin/Swift/Flutter) | 2 | mobile apps, device security |
| Backend developer (Java/Kotlin) | 2 | domain services, API, unit tests |
| Test analyst (ISTQB) | 1 | designing and executing test cases, reporting defects |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Discovery and prototype | 1–4 | journey map, backlog, prototype |
| 2. Architecture and foundations | 5–8 | ADR, skeleton, CI/CD |
| 3. Iterative development | 9–22 | increments every sprint, demos |
| 4. Stabilization and acceptance testing | 23–26 | UAT, security and accessibility tests |
| 5. Deployment and post-launch support | 27–30 | go-live, hypercare, handover |
Technology stack
Flutter, Kotlin, Spring Boot, PostgreSQL, inverter API integrations.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Dependence on an external vendor and its deadlines | early agreement on API contracts, a stub environment, a weekly dependency review |
| Scope creep during the project | a backlog with MoSCoW priorities, every change goes through the committee with an estimate of its impact on the schedule |
| Non-compliance with accessibility requirements | screen reader testing in every sprint, components accessible by design, an expert audit before release |
Measurable goals and KPIs
The values below are targets that we agree with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Active users of the solution | ≥ 80% of the target group after 3 months | usage telemetry |
| Sessions without a mobile app crash | ≥ 99.8% | crash reporting tool |
| Internal user satisfaction | ≥ 8/10 | quarterly survey |
Lessons learned and good practices
Explaining the settlement reduces the number of calls more than any campaign. Integrations with inverter manufacturers need monitoring, because their APIs change. Feature flags separate deployment from launch and radically reduce release stress.
Why B2B.net
We combine two models: we supply individual specialists and whole teams (time and materials, team leasing), and when a client prefers to hand over responsibility for the outcome, we work at a fixed price per scope. We have access to a large network of engineers in six cities, SAP Center of Expertise competencies, and experience with ISO 27001, DORA, and NIS2 requirements. If someone leaves the team, a replacement is in place within 5 business days.
Acceptance criteria
Each phase ends with a formal acceptance against criteria agreed at the start. In this implementation, acceptance covers: journey map, backlog, prototype; ADR, skeleton, CI/CD; increments every sprint, demos; UAT, security and accessibility tests; go-live, hypercare, handover. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.
Next step
If you recognize these problems in your organization, let's start with a short diagnosis: one workshop with your team and a written recommendation. Write to us: office@b2bnetwork.pl.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.