Night work and maintenance windows at a telecom operator: how to organize them

B2Bnetwork team · · 6 min

IT in telecom

In brief

A maintenance window is a pre-agreed block of time, usually at night, in which an operator makes changes to the network and systems when customer traffic is lowest. A well-organized window has a script with clock times, “go on or roll back” decision points, a proven rollback plan, assigned roles, post-change tests, and a handover to the day shift in the morning. People working at night need a fixed schedule and rest, because fatigue is one of the main sources of errors.

Why operators work at night

An operator's network and systems run around the clock, but traffic is not spread evenly. At night the fewest customers call or transfer data, stores are closed, and the helpline handles few tickets. Any change that could cause an interruption or a drop in quality has the smallest impact then.

Maintenance windows usually cover:

  • software updates of network functions and BSS/OSS systems,
  • customer data migrations, for example successive waves when replacing billing,
  • changes to network, routing, and firewall configuration,
  • hardware work in data centers and network nodes,
  • deployments of new tariffs that have to go live at midnight.

Some changes have a window imposed from outside, for example by the effective date of a price list or by arrangements with another operator.

All windows go into a shared change calendar. The calendar shows which changes touch the same systems and helps avoid a situation in which two teams change the network and billing on the same night and in the morning nobody knows which change caused the problem. It also contains change freeze periods, for example before holidays, during big phone launches, or in the last days of the billing cycle, when any failure costs the most.

Window plan: a script with clock times and decision points

The most important document for a window is a script (runbook) with clock times, not a general description of the change. Each step has an owner, a duration, a way to verify it, and a condition for moving on.

An example for a 0:00–5:00 window with migration of part of the customers to a new system:

TimeStepWhoDecision point
23:30readiness check: backups, access, system statusshift lead, administratorsstart or postpone
0:00stop accepting orders in the channelsapplication teamnone
0:15–2:30data migration and record count reconciliationdata teamreconciliation result
2:30–3:30post-change tests on test accountstestersgo on or roll back
3:30last moment to decide on rollbackshift leadfinal decision
4:30open the sales channels, observeeveryonenone
7:00handover to the day teamshift leadnone

The key item is the last moment to roll back. It is counted back from the end of the window: if a rollback takes an hour and the window ends at 5:00, the decision must be made by 4:00 at the latest, with a margin for unexpected problems.

A rollback plan that really works

A rollback plan that is written down but never rehearsed is only a hope. Before the window, it is worth doing the following:

  1. Rehearse the whole window in a test environment, including the rollback, and measure the step times.
  2. Set measurable rollback criteria, for example “more than 1% of test accounts without an active service” or “order system response time above the threshold for 10 minutes”. The numbers in this example are illustrative; every window has its own.
  3. Check what cannot be undone, for example SMS notifications already sent to customers or data passed to another operator, and plan separate actions for them.
  4. Prepare scripts, not a list of commands to type by hand at three in the morning.

Roles and communication during the night

Several teams usually work in a window at once, often from different companies. Without clear roles, people wait for each other or do the same thing twice.

  • The shift lead runs the script, watches the clock, and makes decisions at the checkpoints.
  • Executors from the network, application, and data teams carry out the steps and report the result of each one.
  • Testers verify operation after the change against a prepared list of cases.
  • Monitoring watches alarms and network indicators throughout the night.
  • A business decision maker is on the phone for when a choice has to be made between rolling back and extending the window.

Communication goes through a single channel, with short reports on each step. After the night, it leaves a ready record of what happened, useful for analysis and for the next window.

Post-change tests and the morning after the window

Post-change tests answer one question: can the customer do what they usually do? The list should be short and automated wherever possible: a call, data transfer, top-up, plan change, an order in the web shop, viewing an invoice. A shared automation platform, like the one in the TestFactory scenario, lets you run the same suite at 3:00 at night and at 9:00 in the morning.

The window does not end at 5:00. The first hours of the day, when stores and the helpline open, reveal problems the tests did not catch. The night team hands over with a list of completed steps, deviations from the plan, and things to watch, and someone from the people who carried out the change stays reachable by phone.

For large migrations, for example the BSS replacement described in the article BSS and OSS systems, such windows repeat over many weeks.

People: schedule, rest, and rotation

A series of night windows wears a team down faster than any deadline. A few rules that help:

  • a fixed schedule known in advance, with days off after nights,
  • rotation of roles, so that knowledge of the script does not depend on one person,
  • no combining a night window with a full working day before or after it,
  • staffing with a reserve, because one person's illness must not cancel a window.

When an operator needs to quickly increase staffing for a series of night shifts, an external team that already knows the tools and processes helps. That was the case in the scenario Over 20 people in a week for night and weekend shifts. B2Bnetwork engineers run such teams (What we do).

Questions and answers

How long should a maintenance window be?

As long as the steps measured in rehearsal take, plus rollback time and a margin for unexpected problems. If the total does not fit into one night, the change is split across several windows. It is better to plan three shorter nights with clear decision points than one that ends in the morning traffic peak.

Who decides to roll back a change during the window?

The shift lead, according to criteria written down before the window. When a criterion is met, the decision to roll back needs no discussion. A business decision maker is needed only in situations outside the plan, for example when a choice has to be made between extending the window and rolling back a partly successful migration.

Can post-change tests be fully automated?

Most of them can: test calls, top-ups, orders, and invoice viewing on test accounts can be run automatically after every change. What usually stays manual are cases that need human judgment, for example the look of a new invoice or how a service works on a specific device, and watching network indicators in the first hours.

How can you reduce the number of night windows?

Some changes can be moved to daytime through architecture: rolling updates, shifting traffic between instances, and feature flags. Night windows are left for changes that cannot be made without interruption or without risk to all customers, for example data migrations and work in the network core.