Industry 4.0 in a mid-sized company: where to start digitalization

B2Bnetwork team · · 6 min

IT in manufacturing

In brief

Digitalizing a mid-sized plant starts with one production problem that costs money and the data that measures it, not with buying a platform. A typical first step is automated measurement of run time, downtime and scrap on a few bottleneck machines. That data gives you OEE and the causes of downtime. Only then do you connect it to MES and ERP. In parallel you need to put the OT network in order, because every connected machine is a new path into the plant's systems.

What production digitalization means in practice

Industry 4.0 is a label for something simple: decisions on the shop floor and in the office are made on data collected automatically from machines and systems, not on paper job cards, the shift supervisor's memory and a spreadsheet filled in on Friday. In a mid-sized plant that usually means three changes:

  • machines report on their own whether they are running, idle or producing scrap;
  • orders, batches and confirmations move between the shop floor and ERP without retyping;
  • the shift manager, the process engineer and maintenance see the same numbers at the same time.

The ISA-95 model organizes this into levels: machines and controllers at the bottom, MES in the middle, ERP at the top. Digitalization means connecting those levels with data, not replacing everything at once. The split of responsibilities between MES and ERP is described in the article MES and ERP.

Step 1: choose a problem, not a technology

A project that starts with the question “which IoT platform should we buy” usually ends with charts nobody looks at. A project that starts with a problem has an owner and a measure of success. Examples:

ProblemMeasureData to collect
The line cannot keep up with the planOEE and downtime causes on the bottleneckmachine run and idle state, piece counter, reason code
High scrap after changeoversscrap rate in the first hour after an order changescrap counter, order number, process parameters
Sudden compressor failuresnumber of unplanned stopsvibration, temperature, motor current
Order costing takes several daystime from order completion to settlementelectronic confirmations of quantity and time
Complaints not answered on timetime from report to decisioncomplaint register linked to the batch

Pick one row. Ideally one where the plant manager can say without looking it up how much an hour of downtime or one batch of scrap costs.

Step 2: collect the machine data that measures the problem

OEE (Overall Equipment Effectiveness) is the product of three ratios: availability (how much of the planned time the machine actually ran), performance (how many pieces it made compared with the standard cycle time) and quality (how many pieces were good). Three signals are enough to calculate OEE: run or idle, piece counter and scrap counter. The fourth, the downtime reason code, is usually entered by the operator on a terminal, because the machine does not know it is waiting for a forklift with material.

Where the signals come from depends on the age of your machines:

  • newer machines with a controller and an OPC UA server: data is read directly, with names and units;
  • older generation controllers: a gateway translates the vendor protocol into OPC UA or MQTT;
  • machines without a controller: a current sensor on the motor supply and a pulse counter give you run, idle and cycle count.

The protocols are compared in the article OPC UA and MQTT, and what to compute at the machine versus in the cloud in the article on edge computing in manufacturing. Every measurement has to carry context: machine, order and item. Without it, shop floor data will not connect to ERP.

Step 3: secure the network before you connect machines

In many plants controllers, panels and office computers sit on one flat network. Connecting machines to a data platform without fixing the network opens a path from the accounting mailbox to the press controller. NIST SP 800-82 Rev. 3 recommends for OT networks, among other things, an asset inventory, splitting the network into zones and controlling traffic between them. The minimum before the first project:

  1. List every device on the production network: model, firmware, who has remote access to it.
  2. Separate the OT network from the office network with a firewall and allow only traffic that has a justification.
  3. Give the data gateway read-only access wherever writing is not needed.
  4. Route all remote service access by machine vendors through one logged channel.

Details are in the article OT security in the plant.

Step 4: connect the data to people and systems

Data only starts working when someone changes a decision because of it. That is why the result of the first stage should land in three places: on a board next to the line (status right now), at the morning production meeting (downtime causes from the previous day) and in ERP (confirmations of quantity and time). That is how the OEE platform with near real-time line data was built.

Digitalization is not only the shop floor. In the plant office a lot of time goes into retyping orders, requests for quotation and complaints into ERP. AI Workers can take over that work, as we describe in the article Which task to start with when bringing AI into a manufacturing company. DYNAMINDS Labs starts such a deployment with a free diagnosis.

What to avoid

  • Platform before problem. A license for a system that has no data and no questions yet.
  • A pilot without an owner in production. IT will build the charts, but nobody will change how they work because of them.
  • Data without context. Piece counters without an order number cannot be costed.
  • A project without ongoing support. Gateways, certificates and updates need an owner after acceptance too.
  • All machines at once. Five bottleneck machines with full context are better than fifty with only a run signal.

Questions and answers

What determines the cost of digitalizing a mid-sized plant?

The number and age of machines, how they are connected, the state of the production network and how many systems need to be integrated. The cheapest part is a first stage on a few machines that already have an OPC UA server. The most expensive part is often cleaning up ERP master data and an OT network nobody has inventoried before. That is why a short review of machines and network is a good place to start.

Can old machines without a controller be connected?

Yes, to the extent OEE requires. A current sensor on the motor supply detects run and idle, and an inductive or optical sensor counts cycles. A gateway collects the data and sends it over MQTT. Such a connection does not give you process parameters, but it is enough to see availability and downtime causes, which is the most common first problem.

Does production digitalization require the cloud?

Not at the start. Data collection, OEE and line boards run on a server in the plant. The cloud helps when a company has several plants and wants to compare them, train models on a long history or avoid running its own infrastructure. Some data, recipes for example, often stays in the plant regardless of that decision.

Who in the company should lead digitalization?

The plant manager and the IT director together, with one named owner for each stage. Production chooses the problem and the measure of success, IT is responsible for the network, integration and support. In smaller companies without their own IT department, an external team that knows both office systems and the production network can take on that role.

What it looks like in a project

Connecting the shop floor with your business systems? Talk to an engineer who has worked on MES and OT.