The client is described by industry and scale, without a name. KPI figures are targets agreed with the client after a baseline measurement.
In brief
- Problem
- Before MDR certification, the manufacturer must demonstrate full traceability from requirements to tests and risk management.
- Approach
- Restructuring the test process according to IEC 62304: a verification plan, traceability of requirements and risks to tests, system and regression testing, and verification reports.
- Goal
- Requirements with full traceability to tests: 100% of safety requirements; Defect detection effectiveness (DDE): ≥ 90%.
Client context
Healthcare combines especially sensitive data with a requirement for immediate availability: a system that is down in an emergency room is a real risk to the patient. The client is a manufacturer of software that supports diagnostic imaging and is classified as a medical device.
Challenge
Before MDR certification, the manufacturer must demonstrate full traceability from requirements to tests and risk management. The current test documentation is incomplete.
Requirements and constraints
- MDR, i.e. Regulation (EU) 2017/745: software with a medical purpose may be a medical device. This requires a software life cycle process compliant with IEC 62304, risk management according to ISO 14971, and full traceability from requirements to tests. (source)
- GDPR, i.e. Regulation (EU) 2016/679, requires data minimization, a legal basis for processing, processing agreements, and, for high-risk processing, a data protection impact assessment (DPIA). In practice it rules out copying production data into test environments without anonymization or pseudonymization. (source)
- The Cyber Resilience Act (Regulation (EU) 2024/2847) imposes security obligations across the whole life cycle on manufacturers of products with digital elements: vulnerability management, an SBOM, and reporting of actively exploited vulnerabilities. (source)
- Project constraints: work only on anonymized or synthetic data outside production, access to systems through the client's infrastructure, and every deliverable shipped with documentation the client's team can take over.
Approach and architecture
We work with an ISTQB-based test process: analysis of the test basis, test case design with black-box techniques (equivalence classes, boundary values, decision tables, state transitions), and then execution with full traceability to requirements. Test priority comes from product risk analysis, not from the order in the specification: we first check what hurts the customer and the regulator when it stops working.
Restructuring the test process according to IEC 62304: a verification plan, traceability of requirements and risks to tests, system and regression testing, and verification reports. Tests for the risks from the ISO 14971 analysis take priority.
Key elements of the solution:
- A verification plan compliant with IEC 62304
- Traceability of requirements and risks to tests
- System and regression testing
- Verification reports for the technical documentation
Team and roles
| Role | Count | Responsibility |
|---|---|---|
| Test manager (ISTQB Advanced) | 1 | test strategy, entry and exit criteria, quality reporting |
| Test analyst (ISTQB) | 3 | designing and executing test cases, reporting defects |
| Compliance specialist | 1 | requirements map, documentation, compliance evidence |
| Product owner and domain experts (client side) | as needed | priorities, business decisions, acceptance |
Phased schedule
| Phase | Weeks | Deliverable |
|---|---|---|
| 1. Analysis and test strategy | 1–3 | test strategy, risk matrix, environment plan |
| 2. Test case design | 4–7 | test case repository with traceability |
| 3. System and integration testing | 8–14 | daily reports, defect register |
| 4. User acceptance testing (UAT) with the business | 15–18 | UAT protocols, exit criteria |
| 5. Closure report and handover | 19–20 | quality report, recommendations |
Technology stack
An ALM tool (Jama, Polarion, or Jira with extensions), Python for automation, DICOM.
Risks and how we mitigate them
| Risk | How we mitigate it |
|---|---|
| Auditor or regulator comments after go-live | compliance involved from the analysis phase, evidence collected along the way, a review before acceptance |
| Scope creep during the project | a backlog prioritized with MoSCoW, every change goes through the committee with a schedule impact estimate |
| Knowledge held in the heads of individuals | pair programming, documentation in the repository, a backup plan for key roles |
Measurable goals and KPIs
The values below are targets that we set with the client after a baseline measurement in the first phase.
| KPI | Target | How it is measured |
|---|---|---|
| Requirements with full traceability to tests | 100% of safety requirements | ALM tool |
| Defect detection effectiveness (DDE) | ≥ 90% | defects found in testing / all defects within 90 days |
| Critical defects found after go-live | 0 critical defects in the first 30 days | production incident log |
Lessons learned and good practices
Traceability built from the start is cheap, and traceability reconstructed before an audit is expensive. Tests for the risks from the ISO 14971 analysis are the part the notified body examines most closely. Exit criteria agreed before testing starts save weeks of disputes at the end of the project.
Why B2B.net
B2B.net S.A. has operated since 2015 and has worked for more than 50 brands, mostly where audits are an everyday matter: in banks, insurers, and critical infrastructure. We are an accredited exam center, so a test methodology is not a declaration for us but a working standard. We deliver a first proposal of specialists within 24 hours, and a team can start within 5 business days.
Acceptance criteria
Each phase ends with formal acceptance against criteria agreed at the start. In this engagement, acceptance covers: test strategy, risk matrix, environment plan; test case repository with traceability; daily reports, defect register; UAT protocols, exit criteria; quality report, recommendations. Final acceptance requires a KPI measurement report against the baseline, complete documentation handed over to the client's team, and a list of recommendations for the next stage, with a cost and risk assessment for each.
Next step
Facing a similar challenge? Write to office@b2bnetwork.pl or call +48 577 317 312. You will get a first proposal of specialists or a plan for the first step within 24 hours.
What would this look like for you?
Book a 30-minute call. We will prepare a plan for the first weeks and a team matched to your system.
Let's talkB2Bnetwork · B2B.net S.A. · accredited exam center. We describe clients by industry and scale, without names.