AI Workers in tenders: requests for proposals and documentation

DYNAMINDS Labs team · · 7 min

AI Workers

In brief

An AI Worker in tenders reads the tender specification (in Polish public procurement, the SWZ) or a request for proposal, lists every requirement with a reference to where it appears in the document, tracks deadlines and drafts the response from a base of approved descriptions, certificates and references. Every statement in the bid has a source. Decisions on whether to bid, the price, declarations and the signature belong to a person, because in public procurement a bid is submitted by an authorized person with an electronic signature.

A tender step by step: who does what

Responding to a tender is the work of several people: a salesperson, a lawyer, engineers writing the technical description and someone who assembles the documents. The AI Worker takes over the part that consists of reading, comparing and assembling.

StageWhat the AI Worker doesWho decides
new proceduresummarizes the subject, deadlines and participation conditionssalesperson: do we bid
specification analysislists requirements, award criteria and required documents with referencesbid manager
questions to the contracting authoritypoints out ambiguities and contradictions, drafts questionsbid manager, before sending
technical descriptionassembles a draft answer from the base with quotes from sourcesthe engineer responsible for the topic
documentsgathers certificates, references and forms, tracks expiry datesthe person assembling the bid
final checkcompares the bid with the requirements listbid manager
price, signature, submissionnothingthe management board or an authorized representative

Specification analysis: a requirements list and a compliance matrix

The most valuable output of the AI Worker is a requirements list nobody has to write by hand. The AI Worker goes through the specification, the description of the subject of the contract, the draft contract and the annexes, and for each requirement records:

  • the text of the requirement and where it is in the document: file, chapter, point,
  • its type: participation condition, technical requirement, award criterion, required document, contract clause,
  • a proposed answer from the base and its source,
  • its status: met, partly met, not met, needs a decision.

This produces a compliance matrix, a table in which the bid manager immediately sees where the company has a ready answer and where an engineer or a lawyer is needed. The AI Worker also looks for contradictions between documents, for example a different delivery date in the specification and in the draft contract. Such a contradiction is a good candidate for a question to the contracting authority.

Searching company documents with a quote from the source works on the principles described in RAG: how AI uses company documents. Why the quote is mandatory is explained in Hallucinations in language models.

Deadlines and form set by Polish procurement law

In public procurement, part of the work is set by the Polish Public Procurement Law (Pzp). The AI Worker calculates deadlines for each procedure and reminds the team about them:

MatterProcedure at or above EU thresholdsProcedure below EU thresholds
request to clarify the specificationthe authority must reply if the request arrived no later than 14 days before the bid deadline (Article 135)the authority must reply if the request arrived no later than 4 days before the deadline (Article 284)
the authority's reply deadlineno later than 6 days before the bid deadlineno later than 2 days before the bid deadline
form of the bidelectronic form, on pain of invalidity (Article 63(1))electronic form, or electronic format with a trusted or personal signature (Article 63(2))

With a shortened bid deadline in a procedure at or above EU thresholds, Article 135 provides for 7 and 4 days respectively. The contracting authority publishes questions and clarifications on the procedure's website, often on the e-Zamówienia platform, so the AI Worker checks it regularly and compares new clarifications with the requirements list. A change to the specification after clarifications is the most common reason why a well-prepared bid turns out to be non-compliant.

With the bid, the contractor attaches a declaration that it is not subject to exclusion and meets the participation conditions (Article 125), and at or above EU thresholds it submits it on the European Single Procurement Document (ESPD) form set out in Commission Implementing Regulation (EU) 2016/7. The AI Worker fills in the ESPD with company data from the base, but the declaration is signed by an authorized person.

The base of approved answers and documents

An AI Worker is only as good as the base it draws on. A good base has three features:

  1. Every answer has an owner and a version. The description of a system maintenance service is approved by the head of that service, and after a change a new dated version is created.
  2. Documents have expiry dates. ISO certificates, insurance policies, official certificates and references expire. The AI Worker warns in advance and does not insert into a bid a document that will expire before the bid deadline.
  3. Answers from past tenders return to the base after verification. A text the contracting authority scored well is worth more than a new draft, but only once someone checks that it is still true.

Part of a bid may be a trade secret, for example a cost calculation or a description of methodology. Article 18(3) of the Pzp protects such information only if the contractor marks it as confidential when submitting it and demonstrates that it is a trade secret. The AI Worker flags passages to consider and drafts the justification, while a lawyer decides on the confidentiality claim.

Requests for proposals from companies

In private purchasing the Pzp does not apply, but the work looks similar: a specification, a list of questions, a deadline, required documents. Large customers, such as telecom operators and banks, often attach a spreadsheet with hundreds of questions about security, business continuity and data protection. This is an ideal task for an AI Worker: answers largely repeat across customers, and a base of approved answers shortens the work from days to a review.

This is how the AI Worker operates in the case study on responding to an operator's B2B tenders, where the goal is answers faithful to their sources, with a quote. When a request concerns products and prices, as in the case study on quotes based on requests for quotation, the flow is described in AI in order handling and quoting.

A bid contains data the company does not show competitors, so it is worth settling where the language model runs before a cost calculation reaches it. The options are compared in A language model in the cloud or on your own server. DYNAMINDS Labs starts such deployments with a free diagnosis and a sample of completed procedures.

Questions and answers

Can an AI Worker submit a bid in a public tender on its own?

It should not. A bid in public procurement is the contractor's declaration of intent, submitted by a person authorized to represent it, with a qualified electronic signature or, below EU thresholds, also a trusted or personal signature. The AI Worker assembles the bid and checks it against the requirements list, while submission stays with a person.

Until when can you ask a question about the tender specification?

The contracting authority must reply if the request arrived within the statutory deadline: in a procedure at or above EU thresholds no later than 14 days before the bid deadline (7 days with a shortened deadline), and below the thresholds no later than 4 days before it. The authority may answer later questions, but it does not have to.

Is it safe to send a tender specification to a language model?

The specification itself is usually a public document, so processing it carries little risk. The risk appears with company materials: cost calculations, methodology descriptions, personal data of the team in the list of staff. The same rules apply to them as to other company data, including the choice of where the model runs.

How do you know an answer in the bid is true?

Every answer prepared by the AI Worker has a quote from a source in the base of approved answers or in company documents. An answer without a source goes to an engineer as a question, not as finished text. Before submission, the bid manager approves the compliance matrix and the engineers approve their sections.