A composite area of tests verifying the behaviour of applications while working with multiple users.
- testing of response time
- detection of so-called ?bottlenecks?
- verification:
- problems sharing resources
- system capacities
- system behaviour depending on the user's location
- problems occur during prolonged use.
In our approach, we focus on the set goal, which is why the projects we implement include:
- creation of proprietary tools,
- verification of various platform configurations on the client side,
- verification of processing efficiency depending on the browser used,
- performance tests taking into account the user interface,
- analysis of the content and structure of exchanged messages,
- distribution of the required computing power between the servers of the customer.
Ensuring optimal operation of IoT/IIoT devices begins with creating an efficient program.
We perform static code analysis, ensuring security and eliminating unstable behaviour of end devices. The APIs used for communication are not easy to verify due to the variety of protocols used and the lack of a user interface (e.g. braking systems), which is why we work with many protocols and physical layers (e.g. GSM).
p PERFORMANCE TESTS
Stages of implementation of the sample project of a performance test
Analysis
Proof of Concept
Test scenarios + Environment
Performance Tests
Interpretation of results
Final report
Post-implementation consultation
Reference tests
Stages of implementation in detail:
- The analysis of project features and definition of the approach. The stage includes review of the "technological stack", how the system is used, its recipients. At this stage, the exchange of traffic is also analysed in terms of structure and content,
- The creation of the solution "Proof of concept" confirming the possibility of carrying out the project,
- The creation of test scenarios and the preparation of the environment,
- The conduction of the capacity tests and the assessing of the effectiveness of applying any corrections,
- The description of the interpretation of the results in the final report,
- The post-implementation consultations and reference tests.
The models of the cooperation
Customer teams
The service is dedicated to the Customers having project teams. We give you the possibility to provide you quickly with the missing competences.
The teams at the headquarters of the B2Bnetwork
We can use our hardware and software. We implement the system that gives you the chance to make monitoring in a constant way.
The models of the accounting
Fixed - Price
The determined area of the project, the requirements, the time of realization and the price.
Time&Material
The budget of the project depends on the work needed to be carried out.
Time&Material with a limit
We determine the area of activities with a limit on the budget and the time of realization.
C